Mira Loma

Project Type: 20 MW / 80 MWh Bulk Energy Storage System (BESS)

Location: Mira Loma, California

Clients: Southern California Edison (SCE), Swinerton, and Tesla

Products/Services: Revenue meters, CAISO NRI

Trimark delivered CAISO-certified revenue metering and telemetry systems on an accelerated schedule to support SCE in commissioning the Mira Loma Bulk Energy Storage System. SCE put the project on a fast track in order to meet state-imposed deadlines to deploy new energy storage following the shutdown of the Aliso Canyon natural gas storage

Talk To Us

About Our Services and Products

Request A Free Consultation