Project Type: PV rated at 3 MW
Location: Lancaster, CA in LA County
EPC: Rosendin Electric, Inc.
Products/Services: Utility metering, revenue meters, SCADA, MET stations, UL 508A
Developed, owned, and operated by Sustainable Power Group (sPower), this site is a 3MW 12kV site that directly ties into the local distribution line. Featuring an outdoor enclosure configuration, this project features a fully self-contained, climate controlled SCADA enclosure with more than 8-hours of backup run time, 2 Solectria SGI750TM and a NEXTracker tracking system. Rosendin Electric, Inc. was the EPC responsible for managing construction. Trimark was contracted to deliver a fully functional PV SCADA system, revenue metering, and meteorological stations to manage the site, maximize profitability, and generate next level production analytics.
