Contact

With over 20 years of experience with utility-scale projects throughout the States, we’re well-equipped to help you meet your business and operational goals.

Contact An Expert

Locations

Headquarters

2365 Iron Point Road, Suite 100
Folsom, CA 95630-8714
Tel: 916.357.5970
Fax: 916.357.5971
info@trimarkassoc.com

El Dorado Hills, CA Office

5011 Golden Foothill Pkwy, Suite 4
El Dorado Hills, CA 95762-9831

Trimark Operations Center

Tel: 916.350.2911
TOC@trimarkassoc.com

Houston, TX Office

2002 Timberloch Place, Suite 200
The Woodlands, TX 77380

Los Angeles, CA Office

6800 Owensmouth Avenue, Suite 265
Los Angeles, CA 91303
Tel: 818.963.4695

Palmdale, CA Office

40015 Sierra Highway, Suite B180
Palmdale, CA 93550-2106

Norfolk, VA Office

2551 Eltham Avenue, Suite O
Norfolk, VA 23513
Tel: 757.855.1040

Expert Perspective

Why does their job matter? Trimark team members explain.

The systems we design are a small, but critical, part of power generation. We design the ‘brains’ that monitor and control each resource to be reliable and durable – in some very tough environments. I’m proud to do my part to leave a lasting benefit for society.

Vince Brashear

Director of Design and Engineering

I help users put Vantage to work for effective resource management. As a bridge between customers and our software team, I write documentation delivered on every system screen that explains Vantage functions such as controls and reporting. That answers most user’s questions right on the spot.

Rob Towns

Customer Success Program Manager

To avoid chaos and support grid reliability and stability, utility-scale resources must tightly manage Voltage, Frequency, NERC and LGIA requirements. Our control solution allows PV and BESS resources to safely connect to the grid, protect their expensive equipment, and bid into more market opportunities.

Stephen Yee

Director of SCADA Controls

Network resiliency is a really big deal for power resources. My Network Engineering team applies robust reliability measures to support security, redundancy, and remote access.

Christian Stevenson

Principal Network Engineer

Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.

Tom Noble

Engineering Project Manager II

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today