Contact

With over 20 years of experience with utility-scale projects throughout the States, we’re well-equipped to help you meet your business and operational goals.

Contact An Expert

Locations

Headquarters

2365 Iron Point Road, Suite 100
Folsom, CA 95630-8714
Tel: 916.357.5970
Fax: 916.357.5971
info@trimarkassoc.com

El Dorado Hills, CA Office

5011 Golden Foothill Pkwy, Suite 4
El Dorado Hills, CA 95762-9831

Trimark Operations Center

Tel: 916.350.2911
TOC@trimarkassoc.com

Houston, TX Office

2002 Timberloch Place, Suite 200
The Woodlands, TX 77380

Los Angeles, CA Office

6800 Owensmouth Avenue, Suite 265
Los Angeles, CA 91303

Palmdale, CA Office

40015 Sierra Highway, Suite B180
Palmdale, CA 93550-2106

Norfolk, VA Office

2551 Eltham Avenue, Suite O
Norfolk, VA 23513
Tel: 757.855.1040

Expert Perspective

Why does their job matter? Trimark team members explain.

To avoid chaos and support grid reliability and stability, utility-scale resources must tightly manage Voltage, Frequency, NERC and LGIA requirements. Our control solution allows PV and BESS resources to safely connect to the grid, protect their expensive equipment, and bid into more market opportunities.

Stephen Yee

Director of SCADA Controls

Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

Tom Short

Chief Operations Support Officer

I develop control software that simplifies the operation of utility-scale solar power generation and energy storage. That’s key to making renewable energy stable, reliable, and viable – which is how we’ll save the world.

Brian Buhl

Principal Software Engineer

Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.

Tom Noble

Director of Project Engineering

Over the last 20 years, we’ve helped over 900 resources navigate CAISO’s NRI. With owners building more utility-scale renewable generation nationwide they’re now asking Trimark to help them comply with PPA and interconnection requirements in ERCOT, MISO, ISO New England, NYSERDA – really anywhere that complex agreements require expert advice.

Jennifer Strand

TCS Manager

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today