Corazon Ranch Solar (Under Construction)
Feb 03, 2021
Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Leverage Trimark’s decades of industry experience to make your utility-scale renewable generation and energy storage project a success.
To help you anticipate and avoid challenges, our power-sector veterans provide the advice you need to make a smart start. We guide you through planning, design, procurement, construction, installation, commissioning, and servicing systems used to operate renewable and storage resources.
Understand the business, operational, and technical requirements of the interconnection process to set your course for success.
I need help with Requirements!
Make informed decisions about SCME, compliance requirements,
equitable settlements, ongoing reporting, equitable loss assignment, and integration with control.

Leverage experts in PV and BESS monitoring and control to plan a
successful deployment or overcome issues that may occur after
commissioning.
Draw insight from SCADA professionals for help with:
Get an expert on your side to support planning, selection, completion, criteria and alignment with your plan.
Understand the business, operational, and technical requirements of the interconnection process to set your course for success.
I need help with Requirements!
Make informed decisions about SCME, compliance requirements,
equitable settlements, ongoing reporting, equitable loss assignment, and integration with control.

Leverage experts in PV and BESS monitoring and control to plan a
successful deployment or overcome issues that may occur after
commissioning.
Draw insight from SCADA professionals for help with:
Get an expert on your side to support planning, selection, completion, criteria and alignment with your plan.
Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

To avoid chaos and support grid reliability and stability, utility-scale resources must tightly manage Voltage, Frequency, NERC and LGIA requirements. Our control solution allows PV and BESS resources to safely connect to the grid, protect their expensive equipment, and bid into more market opportunities.

Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.
The systems we design are a small, but critical, part of power generation. We design the ‘brains’ that monitor and control each resource to be reliable and durable – in some very tough environments. I’m proud to do my part to leave a lasting benefit for society.

We start by understanding our client’s needs. One way we do this is by creating a system block diagram to show Trimark’s equipment and scope. Our customers often rely on our diagrams to make sure everyone is on the same page.

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…
Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!