Colgreen North Shore
Jan 06, 2019
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Leverage Trimark’s decades of industry experience to make your utility-scale renewable generation and energy storage project a success.
Talk To An Expert
To help you anticipate and avoid challenges, our power-sector veterans provide the advice you need to make a smart start. We guide you through planning, design, procurement, construction, installation, commissioning, and servicing systems used to operate renewable and storage resources.
Understand the business, operational, and technical requirements of the interconnection process to set your course for success.
I need help with Requirements!
Make informed decisions about SCME, compliance requirements,
equitable settlements, ongoing reporting, equitable loss assignment, and integration with control.

Leverage experts in PV and BESS monitoring and control to plan a
successful deployment or overcome issues that may occur after
commissioning.
Draw insight from SCADA professionals for help with:
Get an expert on your side to support planning, selection, completion, criteria and alignment with your plan.
Understand the business, operational, and technical requirements of the interconnection process to set your course for success.
I need help with Requirements!
Make informed decisions about SCME, compliance requirements,
equitable settlements, ongoing reporting, equitable loss assignment, and integration with control.

Leverage experts in PV and BESS monitoring and control to plan a
successful deployment or overcome issues that may occur after
commissioning.
Draw insight from SCADA professionals for help with:
Get an expert on your side to support planning, selection, completion, criteria and alignment with your plan.
I develop control software that simplifies the operation of utility-scale solar power generation and energy storage. That’s key to making renewable energy stable, reliable, and viable – which is how we’ll save the world.
I help users put Vantage to work for effective resource management. As a bridge between customers and our software team, I write documentation delivered on every system screen that explains Vantage functions such as controls and reporting. That answers most user’s questions right on the spot.
We start by understanding our client’s needs. One way we do this is by creating a system block diagram to show Trimark’s equipment and scope. Our customers often rely on our diagrams to make sure everyone is on the same page.

Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.
Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…
Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…
Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!