Antelope Expansion 2

Antelope Expansion 2 Project

Antelope Expansion 2 Project

Project Type: PV rated at 105 MW

Location: Lancaster, CA in LA County

EPC: D.H. Blattner

Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

Trimark News

Sulaimaan Bhatti Earns His California P.E. License!

Mar 02, 2026

We are excited to share that Sulaimaan Bhatti has officially attained his California Professional Engineering (P.E.) license – a significant…

Learn More

25-Years of Innovative Solutions for Electric Power Infrastructure

Mar 28, 2025

Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More

RTAC Q&A with Trimark’s Dean Fagan

Jan 25, 2022

Dean Fagan, Director of SCADA Integration at Trimark Associates, has over 24 years of experience in planning, implementing, and supporting…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Midway II

Dec 03, 2018

Project Type: PV rated at 30 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More

West Line

Jun 26, 2023

Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…

Learn More

Southampton Solar

Jan 22, 2019

Project Type: PV rated at 100 MW Location: Franklin, VA in Southampton County EPC: Signal Energy Products/Services: SCADA, MET stations…

Learn More

Colgreen North Shore

Jan 06, 2019

Project Type:  PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…

Learn More