Landis+Gyr Revenue Meters No Longer CAISO Approved
Oct 16, 2023
According to CAISO, Landis+Gyr meters are no longer approved for new or replacement installations at CAISO-metered entities. The change was…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: PV rated at 105 MW
Location: Lancaster, CA in LA County
EPC: D.H. Blattner
Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)
Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

According to CAISO, Landis+Gyr meters are no longer approved for new or replacement installations at CAISO-metered entities. The change was…
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Navigating CAISO’s New Resource Implementation (NRI) process takes more than completing a few forms. It requires a mix of competencies…
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…
According to CAISO, Landis+Gyr meters are no longer approved for new or replacement installations at CAISO-metered entities. The change was…
Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…
Project Type: 15 MW PV/25 MWh BESS Location: Angel Fire, NM Client/EPC: Torch Clean Energy Products/Services: Trimark SCADA including Vantage,…
Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS Location: Taos, NM Client/EPC: Torch Clean…
Project Type: PV generating facility rated at 20 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric/sPower Products/Services: Trimark provided…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!