Antelope Expansion 2 Project

Antelope Expansion 2 Project

Project Type: PV rated at 105 MW

Location: Lancaster, CA in LA County

EPC: D.H. Blattner

Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

Trimark News

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More
Trimark Finalizes Controls for Phase 1A of World’s Largest PV+BESS Project

Trimark Awarded SCADA for World’s Largest PV+BESS Project

Feb 17, 2021

The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Chevron

Chevron 2 and 8.5

Jan 22, 2019

Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…

Learn More
Midlant Advanced Metering Infrastructure

Midlant Advanced Metering Infrastructure (AMI)

Jan 09, 2019

Project Type: Automated Metering Infrastructure (AMI) Location: VA, MD, PA, NJ, CT and ME Client: Subcontractor to Weston; Client: Naval…

Learn More
Terra-Gen-scaled

Terra-Gen Multi-Site Maintenance Service Agreements

Feb 05, 2020

Project Type: Wind sites – over 21 sites Location: CA Client/EPC: N/A Products/Services: Multi-site service agreement with Trimark Operations Center…

Learn More

Longroad Energy Multi-Site Maintenance and Data Management Service Agreements

Jan 28, 2020

Project Type: PV generating facilities – over 50 sites Location: CA and MA Client/EPC: N/A Products/Services: Multi-year service agreement with…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today