Antelope Expansion 2

Antelope Expansion 2 Project

Antelope Expansion 2 Project

Project Type: PV rated at 105 MW

Location: Lancaster, CA in LA County

EPC: D.H. Blattner

Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

Trimark News

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More
Trimark Finalizes Controls for Phase 1A of World’s Largest PV+BESS Project

Trimark Awarded SCADA for World’s Largest PV+BESS Project

Feb 17, 2021

The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…

Learn More
Trimark On-Premise Controller Meets NERC-CIP Requirements

Trimark Announces Realtime Monitoring of CAISO RIGs

Jul 06, 2022

Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…

Learn More

Trimark Headed to RE+ 2024

Aug 01, 2024

Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
SBES

Edwards Sanborn

Jun 26, 2023

Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…

Learn More
Gaskell

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More
Southampton Solar

Southampton Solar

Jan 22, 2019

Project Type: PV rated at 100 MW Location: Franklin, VA in Southampton County EPC: Signal Energy Products/Services: SCADA, MET stations…

Learn More

Summer and Winter Wheat

Jan 06, 2019

Project Type: 2 Co-located PV sites rated at 20 MW (Summer) & 1.5 MW (Winter) Location: San Joaquin, CA EPC:…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today