Project Type: PV rated at 3.75
Location: Lancaster, California
Client: SolarCity
Products and Services: Revenue meter, RIG, SCADA, MET station, CAISO NRI
Trimark provided its end-to-end SCADA solution to ensure that the Antelope Valley Solar project had a complete, integrated CAISO-compliant system with full-featured controls.
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…
Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…