Trimark Associates, Inc., the industry leader in intelligent renewable energy control, has deployed Vantage™ on client premises. This portfolio asset monitoring and management system meets NERC-CIP Medium Impact Requirements while still allowing regional operation centers to manage distributed solar and wind power resources. Trimark’s industry-leading solution is the only utility-scale SCADA solution that can be deployed in the cloud, a private cloud, and hybrid environments while maintaining full monitoring and operations capabilities.

Based on NERC-reliability standards, Trimark’s client decided to move control of sites that generate more than 75 MW to their NERC-registered data center because NERC does not currently have security standards for control systems that are hosted in the cloud.

Trimark collaborated with the client in all aspects of the project including understanding NERC requirements, system setup, physical design considerations, and database migration strategies. Trimark configured its system to allow control requests only from the customer data center. Trimark also configured the system to retain read-only cloud access for business functions (e.g. reporting, billing, and analytics) that have no control implications. This approach allows business users full and direct access to business data while supporting NERC’s requirements.

The resulting system utilized existing server hardware at an established control center in Utah that manages generation resources located throughout the United States. Based on the success of this project, Trimark was also contracted to deliver similar, on-premise SCADA at two additional regional control centers in Ohio.

Trimark’s SCADA solution combines intelligent automation, real-time control, and a highly-intuitive user interface. Trimark’s SCADA lets users view and control entire resources or a specific device at a site. The system automates routine actions, validates, and processes external commands, and unifies control over all elements of the resource to deliver precise power values at the point of interconnection.

About Trimark

Trimark Associates, Inc. (Trimark) delivers industry-leading solutions to allow real-time operational control, enable informed management of power production operations, and support regulatory compliance. Trimark’s turnkey products, engineering, and customer support services control, measure, and manage all aspects of power production that utility-scale power producers require to maintain peak business performance.

Trimark News

Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS

Apr 18, 2022

Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Trimark Announces True:SCADA®; to Optimize Utility-Scale PV+BESS Resources

Sep 02, 2025

Trimark Associates, Inc. has announced True:SCADA®, a reimagined control solution, engineered specifically for utility-scale photovoltaic (PV) and battery energy storage…

Learn More

CAISO’s EDAM Creates Market and Metering Opportunities

Apr 30, 2026

May 1 is a significant milestone for electric power in the Western United States. According to CAISO, “On May 1…

Learn More

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

Landis+Gyr Revenue Meters No Longer CAISO Approved

Oct 16, 2023

According to CAISO, Landis+Gyr meters are no longer approved for new or replacement installations at CAISO-metered entities. The change was…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Mulligan

Jun 26, 2023

Project Type: 70 MW Solar AC Coupled Location: Logan County, Illinois Client/EPC: APEX Clean Energy Products/Services: Trimark SCADA including Vantage,…

Learn More

Antelope Valley Solar

Jan 05, 2019

Project Type: PV rated at 3.75 Location: Lancaster, California Client: SolarCity Products and Services: Revenue meter, RIG, SCADA, MET station,…

Learn More

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More

Luna BESS

Jun 26, 2023

Project Type: 100 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Luna BESS supports power stability by addressing the…

Learn More