Sunshine Valley Substation

Sunshine Valley Substation

Project Type: PV generating facility rated at 100 MW

Location: Amargosa Valley, NV

Client/EPC: Electrical Consultants, Inc.

Products/Services: Trimark provided project management, technical documentation, programming and configuration, and field installation of two meters, plus CAISO New Resource Implementation (NRI) services, including installation of the meters, pretesting, test schedule coordination, point-to-point testing, and meter certification by a CAISO certified inspector.

Trimark News

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More
Names Rajinita Haumschilt

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark to Exhibit at Cleanpower 2024 in Minneapolis

Feb 22, 2024

Trimark will exhibit at the Cleanpower Conference and Exhibition, May 7-9, 2024 in the Minneapolis Convention Center. You can find…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
San Pablo Raceway A and B

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More
Chevron

Chevron 2 and 8.5

Jan 22, 2019

Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…

Learn More
Terra-Gen-scaled

Terra-Gen Multi-Site Maintenance Service Agreements

Feb 05, 2020

Project Type: Wind sites – over 21 sites Location: CA Client/EPC: N/A Products/Services: Multi-site service agreement with Trimark Operations Center…

Learn More

Lawai PV and Storage

Jan 29, 2020

Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today