Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Texas state map illustrated in blue, white, and red, set against a yellow textured background.

Solar Power Generation is Booming in Texas. Trimark is Committed to Help.

Folsom, CA, August 8, 2022 – Trimark Associates, Inc., the industry leader in intelligent energy control, has opened an office in The Woodlands, Texas. This office provides a center of excellence for Trimark’s team to effectively serve the state’s expanding, renewable-energy market.

“Trimark delivers advanced control and monitoring solutions that are trusted by many of the largest utility-scale photovoltaic generation and battery storage owners in the U.S.,” explained Mark Morosky, Trimark’s President and CEO. “Our Texas-based workforce blends local knowledge with practical experience to develop and deploy complex control systems required to effectively operate PV generation and storage resources.”

Texas is Experiencing Another Energy Boom – This Time it’s Green.

By 2023, Texas will add about 30 GW of solar power generation, making the Lone Star state the fastest growing photovoltaic (PV) market in the U.S. The trend accelerates from there. According to Bloomberg.com, a record 106 GW of solar resource development is proposed with the Electric Reliability Council of Texas (ERCOT). Growth is driven by factors including recent adequacy issues; manageable regulation; reliable sunshine; relatively inexpensive land; and forecast increases in demand for power.

It’s not just generation that’s gaining steam. Texas is adding utility-scale battery energy storage too – often paired with renewable power resources. That means owners need tools to coordinate plant operations and control – providing resource adequacy with fast response to power requests and supporting grid stability with ancillary services.

The Challenges of Distributed Generation

Growth in the renewable sector is a giant stride toward a carbon-free power grid. However, there are many challenges to maintaining grid stability when a significant portion of the electrical generation is fulfilled by intermittent, renewable resources. Instead of managing a few large generators, balancing authorities like ERCOT must now direct hundreds of grid-connected resources to ramp up or reduce generation as supply and demand changes. It’s more challenging to maintain grid frequency when generation resources lack inherent inertia. And, it’s critical to back billions of dollars of power-related transactions with independently-certified revenue meter data.

Trimark Can Help

Trimark’s Texas-based team now has a home. This location will allow team members to better serve projects throughout the state and the entire Southeast. The new office is located at 2002 Timberloch Place, The Woodlands, TX 77380.

About Trimark

Trimark Associates, Inc. (Trimark) delivers industry-leading solutions to allow real-time operational control, enable informed management of power production operations, and support regulatory compliance. Trimark’s turnkey products, engineering, and customer support services control, measure, and manage all aspects of power production that utility-scale power producers require to maintain peak business performance.

Trimark News

Trimark Promotes Haumschilt to VP of Finance and Accounting

Feb 12, 2024

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, advanced metering, and regulatory compliance, has announced that Rajinita…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Ken Gaal Joins Trimark as Senior Director of Human Resources

Sep 22, 2025

Trimark is pleased to announce that Ken Gaal has joined the company as Senior Director of Human Resources where he…

Learn More

Zack Lemley Promoted to Engineering and Design Manager at Trimark Associates

Mar 06, 2026

Trimark Associates is pleased to announce the promotion of Zack Lemley to Manager of Engineering and Design. This advancement reflects…

Learn More

Five Questions with Stephen Dubuisson

Mar 12, 2026

Troubleshooting issues and correcting problems that arise in operating critical infrastructure is a demanding job – everything is high priority….

Learn More

Chen “Leo” Liang Joins Trimark as Principal Meter Engineer

Oct 01, 2025

Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

West Line

Jun 26, 2023

Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…

Learn More

Antelope DSR3

Jan 28, 2020

Project Type: PV generating facility rated at 20 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric/sPower Products/Services: Trimark provided…

Learn More

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More

Antelope DSR3

Jan 28, 2020

Project Type: PV generating facility rated at 20 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric/sPower Products/Services: Trimark provided…

Learn More