Mulligan

Project Type: 70 MW Solar AC Coupled
Location: Logan County, Illinois
Client/EPC: APEX Clean Energy

Products/Services: Trimark SCADA including Vantage, Trimark Historian, Revenue Meters, MET Stations, Network Drops, Computer Equipment Cabinets/Server Racks.

For the Mulligan Solar site in Logan County, Illinois, APEX Clean Energy utilized the systems and services of Trimark to ensure the success of this 70 MW AC project. Trimark procured and deployed a Trimark SCADA system with Vantage, a Trimark Historian, Revenue Meters, MET Stations, Network drops, and racking equipment.

Trimark News

Trimark Headed to RE+ 2024

Aug 01, 2024

Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…

Learn More

Trimark’s End-to-End Solution Is Key in Commissioning World’s Largest PV+BESS Project

Jan 04, 2022

First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Trimark’s End-to-End Solution Is Key in Commissioning World’s Largest PV+BESS Project

Jan 04, 2022

First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More

Nicolis and Tropico

Dec 05, 2018

Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…

Learn More

Edwards Sanborn

Jun 26, 2023

Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…

Learn More

Antelope DSR3

Jan 28, 2020

Project Type: PV generating facility rated at 20 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric/sPower Products/Services: Trimark provided…

Learn More