Trimark On-Premise Controller Meets NERC-CIP Requirements
Aug 01, 2022
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
Trimarkl's OCC delivers NERC-compliant monitoring, alarm response, dispatch, and failover capabilities.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act of 2022 (IRA) promised a 10% tax bonus for building clean power with domestically-produced products, Trimark had a giant head start.
“Because our systems monitor and control critical power infrastructure, Trimark buys U.S. manufactured equipment whenever possible,” stated Mark Morosky, Trimark President and CEO. “Our systems meet or exceed the requirements of the IRA. We’ve been dedicated to that principle for more than 23 years.”
Internal Revenue Service (IRS) Notice 2023-38 established guidance on the tax bonus and associated standards for domestic content. The rules are thoroughly explained by firms like McGuireWoods and Mintz.
“Country of origin and costs depend on many factors including the manufacturer, bid specifications, product availability, and more,” explained Kathryn Wright, Trimark’s Director Production & Field Services.
“Trimark tracks every component in every assembly by serial number,” added Wright. “That allows us to support independent Cost Segregation Studies with documentation on the country of origin, direct-cost certificates, and other required information.”
Compliance with IRA reporting standards is not trivial. According to a related KPMG document, “It is important to be thoughtful about how communications are prepared, how information is requested, validated and stored to minimize concerns. If needed, companies may consider engaging a third party to assist in collection of sensitive data on their behalf.”
Disclaimer: This document is not intended to provide accounting, business, or tax advice nor is it sufficient to avoid tax-related penalties. Trimark recommends that you consult with your tax advisor to research the applicability of this matter to your firm and/or projects.
About Trimark
Trimark Associates, Inc., the industry leader in complex metering and intelligent energy control, delivers industry-leading solutions to allow real-time operational control, enable informed management of power production operations, ensure regulatory compliance, and maximize revenue. Trimark’s turnkey products, engineering, and customer support services control, measure, and manage all aspects of power production that utility-scale power producers require to maintain peak business performance and achieve financial goals.
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
Trimark is pleased to announce that Colin Tepfer has joined the company as Director of Training and Education. Colin is responsible…
FOLSOM, Calif. — Trimark Associates has announced the opening of an Operation Control Center (OCC) in Austin, Texas, to provide…
Dean Fagan, Director of SCADA Integration at Trimark Associates, has over 24 years of experience in planning, implementing, and supporting…
A conversation about power plant operations in Jamaica, effective client engagement, and the future of the electric sector. Steve Abbott…
Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…
Project Type: PV generating facilities – 39 sites Location: Throughout CA with one site in AZ Client/EPC: 39 customers Products/Services:…
Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!