Big Sky North Substation
Jan 10, 2019
Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
Trimarkl's OCC delivers NERC-compliant monitoring, alarm response, dispatch, and failover capabilities.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
A turnkey solution designed to maximize revenue of your utility-scale solar power generation, battery storage, and photovoltaic (PV)+BESS resources.
Trimark’s legacy Vantage SCADA is designed to overcome control challenges and maximize revenue opportunities for utility-scale PV and Battery Energy Storage resources. Its advanced control capabilities help you maximize revenue, optimize asset life, and ensure peak performance for years of productivity.
Our power-industry veterans apply their expertise on every project – from creating advanced logic to field installation and commissioning. Whether your resource is PV, BESS, co-located BESS/PV, or hybrid PV/BESS (AC- or DC-coupled), Trimark has a solution to meet your needs.

Renewable power resources are built to make money. That’s why we collaborate with independent power producers and resource owners to support business and operational requirements.

Vantage presents real time and historical information for your entire portfolio, all in one intuitive view. From there, you can drill in to assess performance of a resource or a specific device.

Vantage unifies control over PV and PV+BESS resources with a built-in Master Plant Controller and split-second execution. It’s the precision you need to meet PPA and LGIA requirements and help protect your assets.

Trimark’s Master Plant Controller (MPC) unifies control over hybrid and/or co-located PV and PV+Battery Energy Storage (BESS) resources. MPC functionality is designed to:

Trimark builds durable solutions on redundant computing equipment – as you should expect from a system that controls critical infrastructure. That investment pays off in high availability, regulatory compliance, and opportunities for market participation.
Learn more about what sets Trimark apart.
I need a proven partnerTrimark takes a 360 approach to cyber security and disaster recovery to support uptime – optimizing generation and maximizing revenue.
Trimark’s network design standards consider a wide range of needs to easily integrate into a client’s NERC CIP Policy, including standard security policies (ACLs) that comply with NERC CIP standards.

Renewable power resources are built to make money. That’s why we collaborate with independent power producers and resource owners to support business and operational requirements.

Vantage presents real time and historical information for your entire portfolio, all in one intuitive view. From there, you can drill in to assess performance of a resource or a specific device.

Vantage unifies control over PV and PV+BESS resources with a built-in Master Plant Controller and split-second execution. It’s the precision you need to meet PPA and LGIA requirements and help protect your assets.

Trimark’s Master Plant Controller (MPC) unifies control over hybrid and/or co-located PV and PV+Battery Energy Storage (BESS) resources. MPC functionality is designed to:

Trimark builds durable solutions on redundant computing equipment – as you should expect from a system that controls critical infrastructure. That investment pays off in high availability, regulatory compliance, and opportunities for market participation.
Learn more about what sets Trimark apart.
I need a proven partnerTrimark takes a 360 approach to cyber security and disaster recovery to support uptime – optimizing generation and maximizing revenue.
Trimark’s network design standards consider a wide range of needs to easily integrate into a client’s NERC CIP Policy, including standard security policies (ACLs) that comply with NERC CIP standards.
Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.
I develop control software that simplifies the operation of utility-scale solar power generation and energy storage. That’s key to making renewable energy stable, reliable, and viable – which is how we’ll save the world.
Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

To avoid chaos and support grid reliability and stability, utility-scale resources must tightly manage Voltage, Frequency, NERC and LGIA requirements. Our control solution allows PV and BESS resources to safely connect to the grid, protect their expensive equipment, and bid into more market opportunities.

Over the last 20 years, we’ve helped over 900 resources navigate CAISO’s NRI. With owners building more utility-scale renewable generation nationwide they’re now asking Trimark to help them comply with PPA and interconnection requirements in ERCOT, MISO, ISO New England, NYSERDA – really anywhere that complex agreements require expert advice.
Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….
Project Type: PV rated at 30 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…
Antelope Expansion 2 Project Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: D.H. Blattner…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!