Lancaster Area Battery (LAB)

Project Type: 127 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES

Products/Services: MPPC Modifications, Vantage User interface Configuration and Hosting, NERC – CIP, Integration of BESS Controls with MPPC and CAISO ADS, and Networking.

Trimark worked with AES on the Lancaster Area Battery (LAB) BESS Project, rated at 127 MW AC, to help AES reach their primary project goal of making the solar energy generated in this project a dispatchable renewable energy resource, and adding additional clean energy available to its end user customers into their Renewable portfolio. With the utilization of Trimark’s services, such as MPPC Modifications, Vantage Configuration and Hosting, NERC – CIP, Integration of BESS Controls

Trimark News

Names Rajinita Haumschilt

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
CAISO-RIG

Ellwood Station

Jan 29, 2020

Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…

Learn More
San Pablo Raceway A and B

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More
Midway I

Midway I

Dec 05, 2018

Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More

Longroad Energy Multi-Site Maintenance and Data Management Service Agreements

Jan 28, 2020

Project Type: PV generating facilities – over 50 sites Location: CA and MA Client/EPC: N/A Products/Services: Multi-year service agreement with…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today