Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims
Jan 02, 2024
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Project Type: PV rated at 30 MW
Location: Near Calipatria, CA in the Imperial Valley
EPC: Blattner Energy
Products/Services: SCADA, revenue meters, MET stations
Developed by Solar Frontier Americas, the site included 15 Power Electronic 2330 inverters, a NEXTracker solar tracking system, and capacitor banks to help regulate power characteristics. Midway II was brought to COD by Solar Frontier Americas before being sold to Dominion Resources Inc. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID).
Ask any electrical engineer for their favorite mathematical formula and you’re likely to hear all about Ohm’s law. It’s an…
Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…
First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…
Project Type: PV generating facility rated at 100 MW Location: Amargosa Valley, NV Client/EPC: Electrical Consultants, Inc. Products/Services: Trimark provided…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!