Meeting CAISO Rules for BESS Metering
Feb 26, 2024
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: 100 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES
Luna BESS supports power stability by addressing the challenges of variable irradiance and curtailment. Luna BESS is located near the Big Sky substation which consolidates more than 700 MW of power generation from over 21 utility-scale photovoltaic (PV) resources spread across 60 square miles of high desert.
Trimark delivered plant controls for the Luna Battery Energy Storage System (BESS). Trimark’s Vantage™ SCADA works in cooperation with the Fluence battery controller to manage the 100 MW/400MWh BESS and support stable power delivery at the Big Sky substation.
Trimark’s Vantage™ SCADA receives, validates, and executes ADS setpoints generated by CAISO. Simultaneously, the system works to maintain Voltage at the POI, as required by Southern California Edison’s Grid Code. To meet these requirements, Trimark’s Power Plant Controller measures power values at the POI, then sends real and reactive power setpoint commands to the Fluence BESS controller. Ongoing measurements and set point adjustments are made to maintain the target values.
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Trimark is pleased to announce that Ken Gaal has joined the company as Senior Director of Human Resources where he…
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…
Trimark is pleased to announce that Colin Tepfer has joined the company as Director of Training and Education. Colin is responsible…
Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 2 audit of Trimark’s SCADA…
Project Type: PV generating facilities rated at 3 MW each Location: Palmdale/Lancaster, CA Client/EPC: Swinerton Products/Services: Trimark’s end-to-end solution for…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…
Project Type: PV generating facilities – 39 sites Location: Throughout CA with one site in AZ Client/EPC: 39 customers Products/Services:…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!