Two Entities Join WEIM
May 05, 2026
Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: 100 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES
Luna BESS supports power stability by addressing the challenges of variable irradiance and curtailment. Luna BESS is located near the Big Sky substation which consolidates more than 700 MW of power generation from over 21 utility-scale photovoltaic (PV) resources spread across 60 square miles of high desert.
Trimark delivered plant controls for the Luna Battery Energy Storage System (BESS). Trimark’s Vantage™ SCADA works in cooperation with the Fluence battery controller to manage the 100 MW/400MWh BESS and support stable power delivery at the Big Sky substation.
Trimark’s Vantage™ SCADA receives, validates, and executes ADS setpoints generated by CAISO. Simultaneously, the system works to maintain Voltage at the POI, as required by Southern California Edison’s Grid Code. To meet these requirements, Trimark’s Power Plant Controller measures power values at the POI, then sends real and reactive power setpoint commands to the Fluence BESS controller. Ongoing measurements and set point adjustments are made to maintain the target values.
Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…
According to CAISO, Landis+Gyr meters are no longer approved for new or replacement installations at CAISO-metered entities. The change was…
Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…
Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…
Project Type: PV rated at 200 MW Location: Kern County, California Client: Signal Energy Constructors Products and Services: SCADA, RIG,…
Antelope Expansion 2 Project Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: D.H. Blattner…
Project Type: Automated Metering Infrastructure (AMI) Location: VA, MD, PA, NJ, CT and ME Client: Subcontractor to Weston; Client: Naval…
Project Type: PV rated at 3.75 Location: Lancaster, California Client: SolarCity Products and Services: Revenue meter, RIG, SCADA, MET station,…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!