Trimark Associates Achieves SOC 2® Type 1 Compliance
Sep 02, 2025
Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 1 audit of Trimark’s SCADA…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: 100 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES
Luna BESS supports power stability by addressing the challenges of variable irradiance and curtailment. Luna BESS is located near the Big Sky substation which consolidates more than 700 MW of power generation from over 21 utility-scale photovoltaic (PV) resources spread across 60 square miles of high desert.
Trimark delivered plant controls for the Luna Battery Energy Storage System (BESS). Trimark’s Vantage™ SCADA works in cooperation with the Fluence battery controller to manage the 100 MW/400MWh BESS and support stable power delivery at the Big Sky substation.
Trimark’s Vantage™ SCADA receives, validates, and executes ADS setpoints generated by CAISO. Simultaneously, the system works to maintain Voltage at the POI, as required by Southern California Edison’s Grid Code. To meet these requirements, Trimark’s Power Plant Controller measures power values at the POI, then sends real and reactive power setpoint commands to the Fluence BESS controller. Ongoing measurements and set point adjustments are made to maintain the target values.
Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 1 audit of Trimark’s SCADA…
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
Trimark is proud to announce the creation of a new Customer Success Manager position, reinforcing its commitment to delivering exceptional…
First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…
New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…
Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…
Project Type: Wind sites – over 21 sites Location: CA Client/EPC: N/A Products/Services: Multi-site service agreement with Trimark Operations Center…
Project Type: 100 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Luna BESS supports power stability by addressing the…
Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!