ALERT — SQMD Plan Affirmations Due to CAISO October 31
Aug 29, 2023
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS
Location: Taos, NM
Client/EPC: Torch Clean Energy
Trimark delivered Vantage™ SCADA controls for the Taos Mesa Energy Facility in New Mexico. It is the first PV+BESS resource control solution to fully comply with the Modular Energy System Architecture Distributed Energy Resource (MESA-DER) open standard. The “hybrid” site controller manages a 15 MWac solar photovoltaic (PV) array along with a 12 MWac / 24 MWh (2 hour) Tesla battery system.
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…
Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…
Project Type: PV rated at 3.75 Location: Lancaster, California Client: SolarCity Products and Services: Revenue meter, RIG, SCADA, MET station,…
Project Type: PV generating facilities – 39 sites Location: Throughout CA with one site in AZ Client/EPC: 39 customers Products/Services:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today