Taos Mesa Energy Center

DCIM

Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS
Location: Taos, NM
Client/EPC: Torch Clean Energy

Trimark delivered Vantage™ SCADA controls for the Taos Mesa Energy Facility in New Mexico. It is the first PV+BESS resource control solution to fully comply with the Modular Energy System Architecture Distributed Energy Resource (MESA-DER) open standard. The “hybrid” site controller manages a 15 MWac solar photovoltaic (PV) array along with a 12 MWac / 24 MWh (2 hour) Tesla battery system.

Trimark News

Energix Renewables Partners with Trimark to Deliver Portfolio-Wide Ignition SCADA on RTAC

Dec 16, 2022

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More
IMG_3829

Happy National Math Day (and Pi Day Too)

Mar 11, 2022

Ask any electrical engineer for their favorite mathematical formula and you’re likely to hear all about Ohm’s law. It’s an…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Colgreen North Shore

Jan 06, 2019

Project Type:  PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…

Learn More

Townsite Solar

Jun 26, 2023

Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…

Learn More
San Pablo Raceway A and B

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More

Lawai PV and Storage

Jan 29, 2020

Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today