Taos Mesa Energy Center

DCIM

Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS
Location: Taos, NM
Client/EPC: Torch Clean Energy

Trimark delivered Vantage™ SCADA controls for the Taos Mesa Energy Facility in New Mexico. It is the first PV+BESS resource control solution to fully comply with the Modular Energy System Architecture Distributed Energy Resource (MESA-DER) open standard. The “hybrid” site controller manages a 15 MWac solar photovoltaic (PV) array along with a 12 MWac / 24 MWh (2 hour) Tesla battery system.

Trimark News

Energix Renewables Partners with Trimark to Deliver Portfolio-Wide Ignition SCADA on RTAC

Dec 16, 2022

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…

Learn More

Four Steps to Meeting SQMD Audit Requirements

Dec 22, 2025

Trimark has successfully completed 2025 SQMD Plan Audits for its Scheduling Coordinator Metered Entity (SCME) clients in the CAISO and…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Attila Varga Joins Trimark as Vice President of SCADA Engineering

Nov 09, 2026

FOLSOM, Calif. — Trimark is pleased to announce that Attila Varga has joined the company as Vice President of SCADA…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Chen “Leo” Liang Joins Trimark as Principal Meter Engineer

Oct 01, 2025

Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More

Carlsbad Energy Center

Jan 10, 2020

Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…

Learn More

Chevron 2 and 8.5

Jan 22, 2019

Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…

Learn More

Lawai PV and Storage

Jan 29, 2020

Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…

Learn More