Carlsbad Energy Center

Carlsbad Energy overall site 20180214_091248

Project Type: 527 MW natural gas-fueled electricity generating plant

Location: Carlsbad, CA

Client/EPC: NRG Energy

Products/Services: Trimark integrated ADS into the Remote Intelligent Gateway (RIG). The Trimark ADS interface sends the 5 minute dispatch automatically to the RIG which is then sent to the plant control system (DCS) or a signal to the Carlsbad DCS to alert the operator to go on CAISO regulation control. This toggle to regulation can be an automated alert to an operator or automatically toggle in the RIG so no manual process is involved.

Talk To Us

About Our Services and Products

Request A Free Consultation