Carlsbad Energy Center

Carlsbad Energy Center

Project Type: 527 MW natural gas-fueled electricity generating plant

Location: Carlsbad, CA

Client/EPC: NRG Energy

Products/Services: Trimark integrated ADS into the Remote Intelligent Gateway (RIG). The Trimark ADS interface sends the 5 minute dispatch automatically to the RIG which is then sent to the plant control system (DCS) or a signal to the Carlsbad DCS to alert the operator to go on CAISO regulation control. This toggle to regulation can be an automated alert to an operator or automatically toggle in the RIG so no manual process is involved.

Trimark News

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Trimark Announces Promotions to Enhance Client Service

Feb 01, 2024

Trimark has announced organizational changes and promotions to bolster the company’s commitment to service excellence. “Rapid market growth in the…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Pullman

Jun 26, 2023

Project Type: 22 MW PV Location: Pullman, MI Client/EPC: AES Products/Services: Trimark SCADA, Trimark Historian, Revenue Meter, MET Station, Network…

Learn More
Beacon Solar

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More

Lancaster Area Battery (LAB)

Jun 26, 2023

Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…

Learn More
La Brisa Wind Farm

La Brisa Wind Farm

Jan 10, 2020

Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today