Cloud-Based ADS Supports Participation in Ancillary Services Market
Oct 06, 2023
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces
Location: Mojave, CA
Client/EPC: Terra-Gen
Trimark delivered and commissioned plant controls for all resources in Edwards-Sanborn Phase 1A – the world’s largest capacity solar-plus-storage project. The seven resources included in the Mojave-based Phase 1A have a nameplate capacity of 810 MW (LGIA limit of 634 MW).
Each resource is managed by Trimark’s intelligent power plant controller (PPC), a utility-scale SCADA system designed to optimize the profitability of photovoltaic (PV) and battery energy storage system (BESS) resources that participate in California’s open energy markets.
To maximize output and support stable power at the point of deliver, each resource’s PPC considers the losses introduced by any of the five hybrid (PV+BESS) and/or two BESS resources. Trimark’s Dynamic Loss Compensator (DLC) calculates energy losses for each resource and applies the value as a control point to the affiliated PPC. Each PPC then adjusts generation, charge and discharge decisions in real time to ensure that its resource delivers the maximum power allowed by the LGIA or the ISO’s target value.
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Trimark Associates, Inc. has announced True:SCADA™, a reimagined control solution, engineered specifically for utility-scale photovoltaic (PV) and battery energy storage…
Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…
Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 2 audit of Trimark’s SCADA…
Dean Fagan, Director of SCADA Integration at Trimark Associates, has over 24 years of experience in planning, implementing, and supporting…
Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…
Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!