Edwards Sanborn

SBES

Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces
Location: Mojave, CA
Client/EPC: Terra-Gen

Trimark delivered and commissioned plant controls for all resources in Edwards-Sanborn Phase 1A – the world’s largest capacity solar-plus-storage project. The seven resources included in the Mojave-based Phase 1A have a nameplate capacity of 810 MW (LGIA limit of 634 MW).

Each resource is managed by Trimark’s intelligent power plant controller (PPC), a utility-scale SCADA system designed to optimize the profitability of photovoltaic (PV) and battery energy storage system (BESS) resources that participate in California’s open energy markets.

To maximize output and support stable power at the point of deliver, each resource’s PPC considers the losses introduced by any of the five hybrid (PV+BESS) and/or two BESS resources. Trimark’s Dynamic Loss Compensator (DLC) calculates energy losses for each resource and applies the value as a control point to the affiliated PPC. Each PPC then adjusts generation, charge and discharge decisions in real time to ensure that its resource delivers the maximum power allowed by the LGIA or the ISO’s target value.

Trimark News

Trimark to Exhibit at Cleanpower 2024 in Minneapolis

Feb 22, 2024

Trimark will exhibit at the Cleanpower Conference and Exhibition, May 7-9, 2024 in the Minneapolis Convention Center. You can find…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More
Gaskell

Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS

Apr 18, 2022

Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Big Sky North Substation

Big Sky North Substation

Jan 10, 2019

Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….

Learn More
Carlsbad Energy Center

Carlsbad Energy Center

Jan 10, 2020

Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…

Learn More
Four Hydroelectric Power Generation Resources

Four Hydroelectric Power Generation Resources

Jan 11, 2019

Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…

Learn More
San Pablo Raceway A and B

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today