Trimark Commissions Controls for Luna BESS
Aug 04, 2022
Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…
Project Type: 100 MW PV (Part of Grand Central cluster)
Location: Eloy, AZ
Client/EPC: AES
Products/Services: Trimark SCADA Systems Integration and Network Drops.
The West Line project consisted of a 100 MW AC solar project located on private lands in City of Coolidge and Pinal County, Arizona. This Project interconnected to Pinal West 230kV substation via approximately 1.2 miles of underground 230kV running north/south between the eastern edge of county pavement and west of the ED2 MV distribution overhead lines. Trimark assisted AES in this project by providing Trimark SCADA Systems Integration along with 30 Network Drops included with patch panels.
Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
Project Type: Wind 27.392 MW Location: Mojave, CA Client: Terra-Gen Products/Services: CAISO revenue meters and ARIG configuration Ridgetop II is…
Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!