Built Right in the USA

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources.

“Our systems are built right – right here in the USA,” explained Mark Morosky, Trimark President and CEO.

“These devices are a key part of critical infrastructure, so it’s essential that they meet strict safety and reliability standards such as NERC-CIP and IEEE,” Morosky says. “That’s one reason we’re committed to buying US products whenever possible and assembling these systems using US workers in California and Virginia.”

“Even our control system software is designed, coded, configured and deployed by our US experts,” added Morosky.

Recently, a client asked Trimark to certify the origin of every item in our systems as a prerequisite for claiming tax incentives.

“Trimark tracks every component in every assembly by serial number,” explained Kathryn Wright, Trimark’s Vice President of Production & Field Services. “We supported our client’s independent Cost Segregation Study by certifying costs and origin. That documentation proves that our products exceed the requirements for domestic sourcing.”

Trimark is proud to provide the following assertions regarding our systems:

  • US Sourced Materials: Trimark assembles systems in the US from equipment sourced from US manufacturers whenever possible. Trimark meets the reporting requirements defined by Internal Revenue Service (IRS) Notice 2023-38 establishing standards for domestic content.
  • SCADA Software: Trimark’s SCADA System is architected, built, configured, and commissioned by US software developers and system integrators.
  • Security and Networking: Trimark’s Security and Networking is designed, built, and implemented by US based teams.

About Trimark

Trimark Associates, Inc., the industry leader in complex metering and intelligent energy control, delivers industry-leading solutions to allow real-time operational control, enable informed management of power production operations, ensure regulatory compliance, and maximize revenue. Trimark’s turnkey products, engineering, and customer support services control, measure, and manage all aspects of power production that utility-scale power producers require to maintain peak business performance and achieve financial goals.

Trimark News

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark Achieves SOC 2® Type 2 Compliance

Feb 05, 2026

Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 2 audit of Trimark’s SCADA…

Learn More

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS

Apr 18, 2022

Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…

Learn More

Trimark Welcomes Ciara Minion to Lead Customer Success Initiative

Oct 10, 2025

Trimark is proud to announce the creation of a new Customer Success Manager position, reinforcing its commitment to delivering exceptional…

Learn More

Chen “Leo” Liang Joins Trimark as Principal Meter Engineer

Oct 01, 2025

Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

U.S. Navy – Naval District Washington Energy Management

Jan 01, 2019

Installed 1,043 advanced energy meters to track energy usage throughout Northern Virginia, Washington D.C., and Maryland. Work involved 14 separate…

Learn More

West Line

Jun 26, 2023

Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…

Learn More

Carlsbad Energy Center

Jan 10, 2020

Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…

Learn More

La Brisa Wind Farm

Jan 10, 2020

Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…

Learn More