Project Type: PV rated at 152 MW combined
Location: California City, California
Client: Rosendin Electric
Products and Services: SCADA, meter, MET stations
Trimark deployed the SCADA system at three solar sites within the Beacon Solar SCADA project. The sites have entered a power purchase agreement with The Los Angeles Department of Water & Power.
Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…
To our valued clients, You may have recently seen the following email from CAISO: You are receiving this notice as…
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Project Type: 22 MW PV Location: Pullman, MI Client/EPC: AES Products/Services: Trimark SCADA, Trimark Historian, Revenue Meter, MET Station, Network…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today