Trimark’s End-to-End Solution Is Key in Commissioning World’s Largest PV+BESS Project
Jan 04, 2022
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: 15 MW PV/25 MWh BESS
Location: Angel Fire, NM
Client/EPC: Torch Clean Energy
Products/Services: Trimark SCADA including Vantage, SEL RTAC 3555 PPC, Trimark Battery Energy Storage Controls, Revenue Metering, MET Stations, Network Drops, Computer Equipment Cabinet/Server Rack.
Developed and owned by Affordable Solar, Angel Fire Solar Energy Center is a 15 MW Solar PV Project with a 25 MW Tesla Battery Energy Storage System (BESS) located in New Mexico. Trimark provided an end-to-end solution, including a Trimark SCADA with Vantage, an SEL RTAC, Battery Energy Storage Controls, MET Stations, Network Drops, and racking equipment.
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…
Trimark is pleased to announce that Colin Tepfer has joined the company as Director of Training and Education. Colin is responsible…
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…
Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…
Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…
Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!