San Pablo Raceway A and B

San Pablo Raceway A and B

Project Type: PV generating facility rated at 100 MW

Location: Los Angeles County, CA

Client/EPC: Cupertino Electric

Owner: sPower

Products/Services: Trimark provided an end-to-end solution for two solar arrays including a virtual server which runs the Trimark SCADA System with Historian, 9 revenue meters with integration into a Trimark loss compensation system, and 21 network drops. Trimark additionally integrated this resource into an existing CAISO RIG, provided CAISO New Resource Implementation (NRI) services, met NERC/CIP Network Compliance, and coordinated with a third party vendor to integrate MET Stations and sensors into Trimark’s SCADA. To meet CAISO Market and SCE Transmission requirements, controls at the POI were done by integrating into the Trimark Master Plant Controller (MPC) at the sPower Big Sky Substation.

Trimark News

Trimark Expands Executive Management Team

Aug 30, 2024

Trimark Associates, Inc. (Trimark), the industry leader in advanced energy control, complex revenue metering, and regulatory compliance, has promoted five…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Announces True:SCADA™ to Optimize Utility-Scale PV+BESS Resources

Sep 02, 2025

Trimark Associates, Inc. has announced True:SCADA™, a reimagined control solution, engineered specifically for utility-scale photovoltaic (PV) and battery energy storage…

Learn More

Trimark’s End-to-End Solution Is Key in Commissioning World’s Largest PV+BESS Project

Jan 04, 2022

First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…

Learn More

Trimark Associates Achieves SOC 2® Type 1 Compliance

Sep 02, 2025

Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 1 audit of Trimark’s SCADA…

Learn More

Chen “Leo” Liang Joins Trimark as Principal Meter Engineer

Oct 01, 2025

Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Four Hydroelectric Power Generation Resources

Jan 11, 2019

Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…

Learn More

Sunshine Valley Substation

Jan 24, 2020

Project Type: PV generating facility rated at 100 MW Location: Amargosa Valley, NV Client/EPC: Electrical Consultants, Inc. Products/Services: Trimark provided…

Learn More

Ellwood Station

Jan 29, 2020

Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…

Learn More

Lancaster Area Battery (LAB)

Jun 26, 2023

Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…

Learn More