San Pablo Raceway A and B

San Pablo Raceway A and B

Project Type: PV generating facility rated at 100 MW

Location: Los Angeles County, CA

Client/EPC: Cupertino Electric

Owner: sPower

Products/Services: Trimark provided an end-to-end solution for two solar arrays including a virtual server which runs the Trimark SCADA System with Historian, 9 revenue meters with integration into a Trimark loss compensation system, and 21 network drops. Trimark additionally integrated this resource into an existing CAISO RIG, provided CAISO New Resource Implementation (NRI) services, met NERC/CIP Network Compliance, and coordinated with a third party vendor to integrate MET Stations and sensors into Trimark’s SCADA. To meet CAISO Market and SCE Transmission requirements, controls at the POI were done by integrating into the Trimark Master Plant Controller (MPC) at the sPower Big Sky Substation.

Trimark News

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Trimark Appoints Chris Gerlach as Chief Financial Officer

Jul 25, 2022

New CFO to Guide Company Growth and Efficiency Strategies Folsom, CA, July 25, 2022 – Trimark Associates, Inc., the industry…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Hawaii Advanced Metering Infrastructure

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More
CAISO-RIG-2-scaled

39 CAISO Remote Intelligent Gateway (RIG) Replacements for Compliancy

Jan 29, 2020

Project Type: PV generating facilities – 39 sites Location: Throughout CA with one site in AZ Client/EPC: 39 customers Products/Services:…

Learn More
Hope Mills

Hope Mills

Jan 05, 2019

Project Type: PV rated at 80 MW Location: Hope Mills, North Carolina Client: Entropy Solar Integrators, Affinity Automation, LLC, and…

Learn More
Gaskell

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today