Chevron 2 and 8.5

Chevron

Project Type: PV rated at 10.5 MW (Aggregated)

Location: Richmond, CA

EPC: Cenergy Power

Products/Services: SCADA, revenue meters, MET stations, CAISO NRI

Developed by Sustainable Power Group (sPower), the site included Solectria inverters, an ATI DuraTrack solar tracking system, and CAISO MET stations consisting of Hukselflux Pyranometers, a Lufft all-in-one weather station, back-of-module temperature sensors, and a rain gauge. Trimark integrated these devices into the Trimark Data Gateway to provide a delivery pathway of these telemetry points to the CAISO EMS division. These data sensors were assimilated into Trimark’s Vantage HMI, making these points available through real-time and historic trending and accessible through the solar performance analysis platform.

Trimark News

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Trimark Achieves SOC 2® Type 2 Compliance

Feb 05, 2026

Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 2 audit of Trimark’s SCADA…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More

Trimark Announces Realtime Monitoring of CAISO RIGs

Jul 06, 2022

Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…

Learn More

Trimark Announces True:SCADA™ to Optimize Utility-Scale PV+BESS Resources

Sep 02, 2025

Trimark Associates, Inc. has announced True:SCADA™, a reimagined control solution, engineered specifically for utility-scale photovoltaic (PV) and battery energy storage…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Olsen Hydroelectric

Jan 10, 2020

Project Type: Hydro generating facility rated at 5 MW Location: Whitmore, CA Client/EPC: Olsen Power Partners Products/Services: Revenue meters, CAISO…

Learn More

Chevron 2 and 8.5

Jan 22, 2019

Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…

Learn More

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More

Taos Mesa Energy Center

Jun 26, 2023

Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS Location: Taos, NM Client/EPC: Torch Clean…

Learn More