La Brisa Wind Farm
Jan 10, 2020
Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Deploy a comprehensive ISO compliance package to participate in the market.
Talk To An Expert
If you’re navigating the requirements to connect to the electric grid, Trimark is here to help.
To connect resources to CAISO’s control grid, owners must follow CAISO’s New Resource Implementation (NRI) process, install a Remote Intelligent Gateway (RIG), acquire an Energy Communications Network (ECN) connection, and install a CAISO-certified Revenue Meter. Trimark provides complete solutions to help you meet CAISO’s requirements on time and in compliance.
To participate in CAISO’s markets, resources must follow CAISO’s New Resource Implementation (NRI) process and schedule. That’s the formal process that ensures compliance with the CAISO Tarrif.

Trimark has guided over 900 resources through CAISO’s NRI process. We help you understand what’s required, meet CAISO’s strict deadlines, and work with you to make your project successful.
Our turnkey solutions typically pair NRI services with certified metering, RIGs, design package, equipment cabinets, installation, point-to-point testing, certification, and support for ongoing compliance.
I need guidance through the NRI!
Trimark’s RIG fulfills CAISO’s requirement for realtime data-telemetry. Requirements include:
Who do you trust with millions in revenue at stake?
Trimark delivers metering solutions for revenue settlements, incentive programs, and renewable energy credits (RECs).

Trimark’s team includes metering engineers, CAISO-certified meter inspectors, and experienced project managers. We design your metering schemes and networks, procure equipment, configure meters, fabricate cabinets and panels, install meters in the field, connect meters to your CT/PTs, test accuracy and communications, support point-to-point testing, form submittal, then inspect and seal the installation – resulting in a CAISO-certified meter.
To participate in CAISO’s markets, resources must follow CAISO’s New Resource Implementation (NRI) process and schedule. That’s the formal process that ensures compliance with the CAISO Tarrif.

Trimark has guided over 900 resources through CAISO’s NRI process. We help you understand what’s required, meet CAISO’s strict deadlines, and work with you to make your project successful.
Our turnkey solutions typically pair NRI services with certified metering, RIGs, design package, equipment cabinets, installation, point-to-point testing, certification, and support for ongoing compliance.
I need guidance through the NRI!
Trimark’s RIG fulfills CAISO’s requirement for realtime data-telemetry. Requirements include:
Who do you trust with millions in revenue at stake?
Trimark delivers metering solutions for revenue settlements, incentive programs, and renewable energy credits (RECs).

Trimark’s team includes metering engineers, CAISO-certified meter inspectors, and experienced project managers. We design your metering schemes and networks, procure equipment, configure meters, fabricate cabinets and panels, install meters in the field, connect meters to your CT/PTs, test accuracy and communications, support point-to-point testing, form submittal, then inspect and seal the installation – resulting in a CAISO-certified meter.
We start by understanding our client’s needs. One way we do this is by creating a system block diagram to show Trimark’s equipment and scope. Our customers often rely on our diagrams to make sure everyone is on the same page.

To avoid chaos and support grid reliability and stability, utility-scale resources must tightly manage Voltage, Frequency, NERC and LGIA requirements. Our control solution allows PV and BESS resources to safely connect to the grid, protect their expensive equipment, and bid into more market opportunities.

Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

Over the last 20 years, we’ve helped over 900 resources navigate CAISO’s NRI. With owners building more utility-scale renewable generation nationwide they’re now asking Trimark to help them comply with PPA and interconnection requirements in ERCOT, MISO, ISO New England, NYSERDA – really anywhere that complex agreements require expert advice.
Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.
Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Project Type: Wind 27.392 MW Location: Mojave, CA Client: Terra-Gen Products/Services: CAISO revenue meters and ARIG configuration Ridgetop II is…
Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!