Trimark will Announce True:SCADA at RE+ 2025
Aug 01, 2025
Trimark will unveil True:SCADA™ in Booth V8923 on September 9 during the RE+ conference at the Venetian Convention Center in…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Installed 1,043 advanced energy meters to track energy usage throughout Northern Virginia, Washington D.C., and Maryland. Work involved 14 separate bases including the Washington Navy Yard, National Naval Research Laboratory, National Naval Medical Center, Naval Observatory, US Naval Academy, and US Naval Academy in Annapolis. $3.2 million project value.
Trimark will unveil True:SCADA™ in Booth V8923 on September 9 during the RE+ conference at the Venetian Convention Center in…
Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Trimark Associates, Inc. has announced True:SCADA™, a reimagined control solution, engineered specifically for utility-scale photovoltaic (PV) and battery energy storage…
Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…
Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…
Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…
Project Type: PV generating facilities rated at 3 MW each Location: Palmdale/Lancaster, CA Client/EPC: Swinerton Products/Services: Trimark’s end-to-end solution for…
Project Type: PV rated at 80 MW Location: Hope Mills, North Carolina Client: Entropy Solar Integrators, Affinity Automation, LLC, and…
Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!