Southampton Solar

Southampton Solar

Southampton-Solar-20171004_102807_002Project Type: PV rated at 100 MW

Location: Franklin, VA in Southampton County

EPC: Signal Energy

Products/Services: SCADA, MET stations

Designed by Westwood, the site included 42 TMEIC 2500kW inverters and a NEXTracker solar tracking system. Southampton Solar was brought to COD by Signal Energy for Dominion Energy. Signal Energy was the EPC responsible for managing construction. Signal Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stabilize power at the point of interconnection. Trimark also designed and installed 6 meteorological weather station as well as 30 remote wind stations.

Trimark News

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

25-Years of Innovative Solutions for Electric Power Infrastructure

Mar 28, 2025

Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…

Learn More

Chen “Leo” Liang Joins Trimark as Principal Meter Engineer

Oct 01, 2025

Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…

Learn More

Trimark Announces Strategic Leadership Promotions to Support Expansion

Feb 02, 2026

Trimark today announced five leadership promotions that reinforce the company’s ability to earn client trust, retain long‑standing partners, and support…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Lawai PV and Storage

Jan 29, 2020

Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…

Learn More

Ellwood Station

Jan 29, 2020

Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…

Learn More

Midway I

Dec 05, 2018

Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More

Southampton Solar

Jan 22, 2019

Project Type: PV rated at 100 MW Location: Franklin, VA in Southampton County EPC: Signal Energy Products/Services: SCADA, MET stations…

Learn More