Alta Wind 4, 5, 8, and 9
>
Project Type: CAISO meter replacements
Alta Wind 4 & 5 – Owned by Clearway Energy
Alta Wind 8 – Owned by Brookfield
Alta Wind 9 (Now Pinyon Pines II ) – Owned by BHE Renewables
Alta Wind 4 – CAISO meter replacement – 150 MW
Alta Wind 5 – Meter replacement – 150 MW
Alta Wind 8 – CAISO meter replacement – 150 MW
Alta Wind 9 – CAISO meter replacement- 150 MW
French Meadows – Meter replacement- 150 MW
Location: Various locations in California
Products/Services: Revenue meters at all locations
Trimark replaced the CAISO-certified revenue metering for each of the sites with the three separate resource owners. All four sites communicate through peer-to-peer functioning. Trimark worked with a third party programmer to program and install main and back-up meters at each of the wind sites.