Trimark Adds Texas Office to Serve Growing, Green-Energy Market
Aug 09, 2022
Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
The power to Create, to Configure, to Commission, to Control.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: Hydroelectric with 10.6 MW combined
Location: Shasta County, California
Client: Stoel Rives, LLP for PG&E
Products and Services: Revenue meters, QF process
Trimark was selected by Stoel Rives, LLP to guide the Bidwell, Hatchet, Roaring and Silver Springs hydroelectric power generation resources through the Qualifying Facility Conversion (QF) process. Under the original Power Purchase Agreement, Pacific Gas & Electric bought power from all four sites. The contract expiration required the sites to undergo the QF process.
Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Navigating CAISO’s New Resource Implementation (NRI) process takes more than completing a few forms. It requires a mix of competencies…
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
What is True? We’re glad you asked. In 2013, Trimark introduced its first-generation SCADA system. Since then, Trimark deployed controls…
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Project Type: PV rated at 75 MW Location: Mecca, CA under Imperial Irrigation District (IID) utility EPC: Sunpin Solar Products/Services:…
Project Type: 2 Co-located PV sites rated at 20 MW (Summer) & 1.5 MW (Winter) Location: San Joaquin, CA EPC:…
Project Type: PV generating facilities rated at 3 MW each Location: Palmdale/Lancaster, CA Client/EPC: Swinerton Products/Services: Trimark’s end-to-end solution for…
Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!