Four Hydroelectric Power Generation Resources

Four Hydroelectric Power Generation Resources

Project Type: Hydroelectric with 10.6 MW combined

Location: Shasta County, California

Client: Stoel Rives, LLP for PG&E

Products and Services: Revenue meters, QF process

Trimark was selected by Stoel Rives, LLP to guide the Bidwell, Hatchet, Roaring and Silver Springs hydroelectric power generation resources through the Qualifying Facility Conversion (QF) process. Under the original Power Purchase Agreement, Pacific Gas & Electric bought power from all four sites. The contract expiration required the sites to undergo the QF process.

Trimark News

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

Trimark Expands Executive Management Team

Aug 30, 2024

Trimark Associates, Inc. (Trimark), the industry leader in advanced energy control, complex revenue metering, and regulatory compliance, has promoted five…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Gaskell

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More
Alta Wind 4, 5, 8, and 9

Alta Wind 4, 5, 8, and 9

Jan 06, 2019

> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…

Learn More
Bayshore A, B, and C

Bayshore A, B, and C

Dec 30, 2018

Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…

Learn More

West Line

Jun 26, 2023

Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today