Trimark’s Expert Voices
Dec 12, 2023
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Project Type: PV rated at 50 MW
Location: Near Calipatria, CA in the Imperial Valley
EPC: Blattner Energy
Products/Services: SCADA, revenue meters, MET stations, CAISO NRI
Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Providing CAISO Remote Intelligent Gateway and Revenue Meter Monitoring and Maintenance Services Folsom, CA, June 26, 2019 – Trimark Associates,…
Trimark Associates, Inc. (Trimark), the industry leader in advanced energy control, complex revenue metering, and regulatory compliance, has promoted five…
Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces Location: Mojave, CA Client/EPC: Terra-Gen Trimark…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today