Midway I

Midway I

Project Type: PV rated at 50 MW

Location: Near Calipatria, CA in the Imperial Valley

EPC: Blattner Energy

Products/Services: SCADA, revenue meters, MET stations, CAISO NRI

Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.

Trimark News

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Trimark Announces Realtime Monitoring of CAISO RIGs

Jul 06, 2022

Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Four Steps to Meeting SQMD Audit Requirements

Dec 22, 2025

Trimark has successfully completed 2025 SQMD Plan Audits for its Scheduling Coordinator Metered Entity (SCME) clients in the CAISO and…

Learn More

Five Questions with Jennifer Strand

Feb 19, 2026

Navigating CAISO’s New Resource Implementation (NRI) process takes more than completing a few forms. It requires a mix of competencies…

Learn More

Two Entities Join WEIM

May 05, 2026

Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More

Olsen Hydroelectric

Jan 10, 2020

Project Type: Hydro generating facility rated at 5 MW Location: Whitmore, CA Client/EPC: Olsen Power Partners Products/Services: Revenue meters, CAISO…

Learn More

U.S. Navy – Naval District Washington Energy Management

Jan 01, 2019

Installed 1,043 advanced energy meters to track energy usage throughout Northern Virginia, Washington D.C., and Maryland. Work involved 14 separate…

Learn More