Trimark to Announce Training Platform at Cleanpower
Apr 06, 2026
On June 2, 2026, Trimark will introduce Trimark Academy – a new learning platform designed to empower power‑industry professionals with…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: PV rated at 50 MW
Location: Near Calipatria, CA in the Imperial Valley
EPC: Blattner Energy
Products/Services: SCADA, revenue meters, MET stations, CAISO NRI
Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.
On June 2, 2026, Trimark will introduce Trimark Academy – a new learning platform designed to empower power‑industry professionals with…
Trimark Associates is pleased to announce the promotion of Zack Lemley to Manager of Engineering and Design. This advancement reflects…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…
February 3, 2026 — Trimark is pleased to announce that the United States Patent and Trademark Office has officially granted…
Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…
Project Type: 2 Co-located PV sites rated at 20 MW (Summer) & 1.5 MW (Winter) Location: San Joaquin, CA EPC:…
Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….
Project Type: PV generating facilities rated at 3 MW each Location: Palmdale/Lancaster, CA Client/EPC: Swinerton Products/Services: Trimark’s end-to-end solution for…
Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!