Midway I

Project Type: PV rated at 50 MW

Location: Near Calipatria, CA in the Imperial Valley

EPC: Blattner Energy

Products/Services: SCADA, revenue meters, MET stations, CAISO NRI

Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.

Trimark News

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Appoints Chris Gerlach as Chief Financial Officer

Jul 25, 2022

New CFO to Guide Company Growth and Efficiency Strategies Folsom, CA, July 25, 2022 – Trimark Associates, Inc., the industry…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Terra-Gen-scaled

Terra-Gen Multi-Site Maintenance Service Agreements

Feb 05, 2020

Project Type: Wind sites – over 21 sites Location: CA Client/EPC: N/A Products/Services: Multi-site service agreement with Trimark Operations Center…

Learn More
Corazon-Ranch-Block

Corazon Ranch Solar (Under Construction)

Feb 03, 2021

Project Type: 200 MW PV Location: Laredo, Texas Client/EPC: Worley (project owned by BayWa r.e.) Products/Services: Trimark provided a full…

Learn More

Summer and Winter Wheat

Jan 06, 2019

Project Type: 2 Co-located PV sites rated at 20 MW (Summer) & 1.5 MW (Winter) Location: San Joaquin, CA EPC:…

Learn More
Gaskell

Gaskell West 2a, 2b, 2BESS, 3, 4, & 5

Jun 26, 2023

Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today