Trimark On-Premise Controller Meets NERC-CIP Requirements
Aug 01, 2022
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: PV rated at 50 MW
Location: Near Calipatria, CA in the Imperial Valley
EPC: Blattner Energy
Products/Services: SCADA, revenue meters, MET stations, CAISO NRI
Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Customers can receive alerts if an outage occurs and view details to expedite mitigation. Trimark Associates, Inc., the industry leader…
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Trimark has successfully completed 2025 SQMD Plan Audits for its Scheduling Coordinator Metered Entity (SCME) clients in the CAISO and…
Navigating CAISO’s New Resource Implementation (NRI) process takes more than completing a few forms. It requires a mix of competencies…
Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…
Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…
Project Type: 105MW PV, 20MW/80MWh BESS Location: Rosamond, CA Client/EPC: Matrix Renewables Products/Services: Trimark SCADA including Vantage, Trimark Remote Intelligent…
Project Type: Hydro generating facility rated at 5 MW Location: Whitmore, CA Client/EPC: Olsen Power Partners Products/Services: Revenue meters, CAISO…
Installed 1,043 advanced energy meters to track energy usage throughout Northern Virginia, Washington D.C., and Maryland. Work involved 14 separate…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!