CAISO’s EDAM Creates Market and Metering Opportunities
Apr 30, 2026
May 1 is a significant milestone for electric power in the Western United States. According to CAISO, “On May 1…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: Wind generating facility rated at 9 MW
Location: Birds Landing Switching Station, Solano County, CA
Client/EPC: EDF Renewable Services
Products/Services: Trimark installed a CAISO approved Remote Intelligent Gateway (RIG) and revenue meter, provided CAISO New Resource Implementation (NRI) support, and implemented Automated Dispatch System (ADS) integration. Three radios were used to communicate between the RIG, meter and, Sonic Detection And Ranging (SODAR) installed by others.
May 1 is a significant milestone for electric power in the Western United States. According to CAISO, “On May 1…
Navigating CAISO’s New Resource Implementation (NRI) process takes more than completing a few forms. It requires a mix of competencies…
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…
We are excited to share that Sulaimaan Bhatti has officially attained his California Professional Engineering (P.E.) license – a significant…
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…
Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…
Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…
Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS Location: Taos, NM Client/EPC: Torch Clean…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!