Vince Brashear, P.E., Director of Design and Engineering

“The systems we design are a small, but critical, part of power generation. We design the ‘brains’ that monitor and control each resource to be reliable and durable – in some very tough environments. I’m proud to do my part to leave a lasting benefit for society.”

Vince applies 30 years of professional experience in electrical, instrumentation/control, and mechanical engineering to design rock-solid equipment packages.

He provides overall project technical oversight and leads the engineering team through design review, to ensure that systems meet the project specifications.

Vince holds a BS in Electrical Engineering from the University of Colorado, Denver. He is a licensed Professional Engineer (P.E.) in five states.

Related Solutions:  Meteorological Stations, Field Network Equipment/Network Drops, SCADA Cabinet, Meter Cabinet.

Trimark News

Two Entities Join WEIM

May 05, 2026

Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

CAISO’s EDAM Creates Market and Metering Opportunities

Apr 30, 2026

May 1 is a significant milestone for electric power in the Western United States. According to CAISO, “On May 1…

Learn More

Inside the OCC: Dean Fagan Talks Planning, Compliance, and Operations

Aug 03, 2026

As Vice President of Real-Time Operations at Trimark, Dean Fagan has a big challenge – building a NERC-compliant, 24/7/365 Operations…

Learn More

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More

What is True?

Jun 26, 2025

What is True? We’re glad you asked. In 2013, Trimark introduced its first-generation SCADA system. Since then, Trimark deployed controls…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More

Lancaster Area Battery (LAB)

Jun 26, 2023

Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…

Learn More

Alta Wind 4, 5, 8, and 9

Jan 06, 2019

> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…

Learn More

Midway I

Dec 05, 2018

Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More