Two Entities Join WEIM
May 05, 2026
Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
Trimarkl's OCC delivers NERC-compliant monitoring, alarm response, dispatch, and failover capabilities.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Vince Brashear, P.E., Director of Design and Engineering
“The systems we design are a small, but critical, part of power generation. We design the ‘brains’ that monitor and control each resource to be reliable and durable – in some very tough environments. I’m proud to do my part to leave a lasting benefit for society.”
Vince applies 30 years of professional experience in electrical, instrumentation/control, and mechanical engineering to design rock-solid equipment packages.
He provides overall project technical oversight and leads the engineering team through design review, to ensure that systems meet the project specifications.
Vince holds a BS in Electrical Engineering from the University of Colorado, Denver. He is a licensed Professional Engineer (P.E.) in five states.
Related Solutions: Meteorological Stations, Field Network Equipment/Network Drops, SCADA Cabinet, Meter Cabinet.
Market Expands Into 12 Western States Two new entities joined the Western Energy Imbalance Market (WEIM) on May 6, 2026…
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
May 1 is a significant milestone for electric power in the Western United States. According to CAISO, “On May 1…
As Vice President of Real-Time Operations at Trimark, Dean Fagan has a big challenge – building a NERC-compliant, 24/7/365 Operations…
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
What is True? We’re glad you asked. In 2013, Trimark introduced its first-generation SCADA system. Since then, Trimark deployed controls…
Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…
Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…
> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…
Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!