Trimark’s End-to-End Solution Is Key in Commissioning World’s Largest PV+BESS Project
Jan 04, 2022
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: PV rated at 20 MW each
Location: Lancaster, CA in LA County
EPC: Signal Energy
Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)
Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
Trimark Associates, Inc. has announced successful completion of a System Organization Controls (SOC) 2® Type 1 audit of Trimark’s SCADA…
Trimark is proud to announce the creation of a new Customer Success Manager position, reinforcing its commitment to delivering exceptional…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
First Resources in Edwards/Sanborn Project Reach Commercial Operation. Folsom, CA, January 4, 2022 – The first four phases of the…
The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…
Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Project Type: PV generating facilities and wind generating facilities – 21 sites Location: CA; one site in AZ Client/EPC: NRG…
Project Type: PV rated at 100 MW Location: Franklin, VA in Southampton County EPC: Signal Energy Products/Services: SCADA, MET stations…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!