Inside the OCC: Dean Fagan Talks Planning, Compliance, and Operations
Aug 03, 2026
As Vice President of Real-Time Operations at Trimark, Dean Fagan has a big challenge – building a NERC-compliant, 24/7/365 Operations…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
Trimarkl's OCC delivers NERC-compliant monitoring, alarm response, dispatch, and failover capabilities.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Project Type: PV rated at 20 MW each
Location: Lancaster, CA in LA County
EPC: Signal Energy
Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)
Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.
As Vice President of Real-Time Operations at Trimark, Dean Fagan has a big challenge – building a NERC-compliant, 24/7/365 Operations…
Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Trimark has some big things to share at RE+ in Las Vegas, November 16-19, 2026. Come visit Trimark in Booth…
Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…
Trimark Associates, Inc. is proud to announce that Chen “Leo” Liang, MEng, P.Eng, has joined the company as Principal Meter…
Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…
Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…
Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…
Project Type: PV rated at 80 MW Location: Hope Mills, North Carolina Client: Entropy Solar Integrators, Affinity Automation, LLC, and…
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!