Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS
Location: Boulder City, NV
Client/EPC: Arevon
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
Project Type: PV rated at 50 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…
Project Type: PV rated at 100 MW Location: Franklin, VA in Southampton County EPC: Signal Energy Products/Services: SCADA, MET stations…