CAISO to Discontinue TLS 1.0/1.1 Support for RIGs
Apr 13, 2021
To our valued clients, You may have recently seen the following email from CAISO: You are receiving this notice as…
>
Project Type: CAISO meter replacements
Alta Wind 4 & 5 – Owned by Clearway Energy
Alta Wind 8 – Owned by Brookfield
Alta Wind 9 (Now Pinyon Pines II ) – Owned by BHE Renewables
Alta Wind 4 – CAISO meter replacement – 150 MW
Alta Wind 5 – Meter replacement – 150 MW
Alta Wind 8 – CAISO meter replacement – 150 MW
Alta Wind 9 – CAISO meter replacement- 150 MW
French Meadows – Meter replacement- 150 MW
Location: Various locations in California
Products/Services: Revenue meters at all locations
Trimark replaced the CAISO-certified revenue metering for each of the sites with the three separate resource owners. All four sites communicate through peer-to-peer functioning. Trimark worked with a third party programmer to program and install main and back-up meters at each of the wind sites.
New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…
Project Type: PV rated at 3.75 Location: Lancaster, California Client: SolarCity Products and Services: Revenue meter, RIG, SCADA, MET station,…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today