Sunshine Valley Substation

Sunshine Valley Substation

Project Type: PV generating facility rated at 100 MW

Location: Amargosa Valley, NV

Client/EPC: Electrical Consultants, Inc.

Products/Services: Trimark provided project management, technical documentation, programming and configuration, and field installation of two meters, plus CAISO New Resource Implementation (NRI) services, including installation of the meters, pretesting, test schedule coordination, point-to-point testing, and meter certification by a CAISO certified inspector.

Trimark News

Trimark Finalizes Controls for Phase 1A of World’s Largest PV+BESS Project

Trimark Awarded SCADA for World’s Largest PV+BESS Project

Feb 17, 2021

The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Hawaii Advanced Metering Infrastructure

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More
Antelope Expansion 2 Project

Antelope Expansion 2

Jan 05, 2018

Antelope Expansion 2 Project Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: D.H. Blattner…

Learn More
Antelope Expansion 2 Project

Antelope Expansion 2

Jan 05, 2018

Antelope Expansion 2 Project Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: D.H. Blattner…

Learn More

Pullman

Jun 26, 2023

Project Type: 22 MW PV Location: Pullman, MI Client/EPC: AES Products/Services: Trimark SCADA, Trimark Historian, Revenue Meter, MET Station, Network…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today