Antelope Expansion 2

Antelope Expansion 2 Project

Antelope Expansion 2 Project

Project Type: PV rated at 105 MW

Location: Lancaster, CA in LA County

EPC: D.H. Blattner

Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

Trimark News

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More

Energix Renewables Partners with Trimark to Deliver Portfolio-Wide Ignition SCADA on RTAC

Dec 16, 2022

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Midlant Advanced Metering Infrastructure

Midlant Advanced Metering Infrastructure (AMI)

Jan 09, 2019

Project Type: Automated Metering Infrastructure (AMI) Location: VA, MD, PA, NJ, CT and ME Client: Subcontractor to Weston; Client: Naval…

Learn More
Bayshore A, B, and C

Bayshore A, B, and C

Dec 30, 2018

Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…

Learn More

Mulligan

Jun 26, 2023

Project Type: 70 MW Solar AC Coupled Location: Logan County, Illinois Client/EPC: APEX Clean Energy Products/Services: Trimark SCADA including Vantage,…

Learn More
San Pablo Raceway A and B

San Pablo Raceway A and B

Jan 28, 2020

Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today