Antelope Expansion 2

Antelope Expansion 2 Project

Antelope Expansion 2 Project

Project Type: PV rated at 105 MW

Location: Lancaster, CA in LA County

EPC: D.H. Blattner

Products/Services: Virtualized SCADA, Scheduling Coordinator Metering Entity (SCME), revenue meters, Loss Compensator, NERC CIP, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), this site is the first resource integrated into the Big Sky North Substation that ties into the Big Sky Substation to feed into the SCE grid. This site was built with 35 Power Electronic 2330kW inverters, an ATI V3.0 tracking system, and an 18MVAR capacity bank to support power reliability. This site ties into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. D.H. Blattner was the EPC responsible for managing construction. Trimark’s role was to implement the PV Virtualized SCADA system as a NERC CIP compliant environment, integrate it into the Big Sky North Loss Compensator system, and provide consultation to the owner in establishing this resource their first SCME generation site.

Trimark News

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More
Names Rajinita Haumschilt

Trimark Promotes Haumschilt to VP of Finance and Accounting

Feb 12, 2024

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, advanced metering, and regulatory compliance, has announced that Rajinita…

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More
IMG_3829

Happy National Math Day (and Pi Day Too)

Mar 11, 2022

Ask any electrical engineer for their favorite mathematical formula and you’re likely to hear all about Ohm’s law. It’s an…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
network-drop-interior

Antelope DSR3

Jan 28, 2020

Project Type: PV generating facility rated at 20 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric/sPower Products/Services: Trimark provided…

Learn More
Hawaii Advanced Metering Infrastructure

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More
Ridgetop II

Ridgetop II

Dec 01, 2018

Project Type: Wind 27.392 MW Location: Mojave, CA Client: Terra-Gen Products/Services: CAISO revenue meters and ARIG configuration Ridgetop II is…

Learn More
Garland Solar

Garland Solar

Jan 05, 2019

Project Type: PV rated at 200 MW Location: Kern County, California Client: Signal Energy Constructors Products and Services: SCADA, RIG,…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?