Project Type: PV rated at 50 MW
Location: Near Calipatria, CA in the Imperial Valley
EPC: Blattner Energy
Products/Services: SCADA, revenue meters, MET stations, CAISO NRI
Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.
Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…
Project Type: PV rated at 30 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…
Project Type: PV generation rated at 28 MW plus 100 MWh/five hour energy storage facility Location: Between Lawai and Koloa…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today