Midway I

Midway I

Project Type: PV rated at 50 MW

Location: Near Calipatria, CA in the Imperial Valley

EPC: Blattner Energy

Products/Services: SCADA, revenue meters, MET stations, CAISO NRI

Developed by Solar Frontier Americas, the site included 25 Power Electronic 2330kW inverters, a NEXTracker solar tracking system, and a capacitor bank to help regulate power characteristics. Midway I was brought to COD by Solar Frontier Americas before being sold to X-ELIO Energy SL. Blattner Energy was the EPC responsible for managing construction. The resource has a 25-year power purchase agreement (PPA) with the Imperial Irrigation District (IID). Blattner Energy contracted Trimark to deliver Trimark SCADA to support PV plant operations, regulate electric power generation and stablize power at the point of interconnection with the Imperial Irrigation District. Trimark also acted as consultants to walk both the contractor and owner through the complexity of the New Resource Implementation cycle for CAISO.

Trimark News

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More
IMG_3829

Happy National Math Day (and Pi Day Too)

Mar 11, 2022

Ask any electrical engineer for their favorite mathematical formula and you’re likely to hear all about Ohm’s law. It’s an…

Learn More

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More
trimark-awarded-service-agreement

Trimark Awarded Service Agreement for Clearway Energy’s Utility-Scale PV Sites

Jun 26, 2019

Providing CAISO Remote Intelligent Gateway and Revenue Meter Monitoring and Maintenance Services Folsom, CA, June 26, 2019 – Trimark Associates,…

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Beacon Solar

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More
Antelope Expansion 2 Project

Antelope Expansion 2

Jan 05, 2018

Antelope Expansion 2 Project Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: D.H. Blattner…

Learn More

Angel Fire Solar Energy Center

Jun 26, 2023

Project Type: 15 MW PV/25 MWh BESS Location: Angel Fire, NM Client/EPC: Torch Clean Energy Products/Services: Trimark SCADA including Vantage,…

Learn More
CAISO-RIG

Ellwood Station

Jan 29, 2020

Project Type: Remote Intelligent Gateway (RIG) relocation Location: Oxnard, CA Client/EPC: GenOn Energy Products/Services: Trimark made configuration changes to an…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today