Olsen Hydroelectric

Olsen Hydroelectric

Project Type: Hydro generating facility rated at 5 MW

Location: Whitmore, CA

Client/EPC: Olsen Power Partners

Products/Services: Revenue meters, CAISO New Resource Implementation (NRI)

Trimark provided technical documentation and design, programming and configuration, and field installation of the meter, along with CAISO NRI services, including installation of the meter, pretesting, test schedule coordination, point-to-point testing, and meter certification by CAISO certified inspector.

Trimark News

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark to Exhibit at ESNA ’24

Oct 18, 2023

Trimark will exhibit at Intersolar North America / Energy Storage North America (ESNA) January 17 to 19, 2024 in the…

Learn More

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark Guides AES’ Raceway and Estrella PV+BESS Resources Through SCE’s New Interconnection Testing Protocol

Mar 29, 2024

Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Ridgetop II

Ridgetop II

Dec 01, 2018

Project Type: Wind 27.392 MW Location: Mojave, CA Client: Terra-Gen Products/Services: CAISO revenue meters and ARIG configuration Ridgetop II is…

Learn More

West Line

Jun 26, 2023

Project Type: 100 MW PV (Part of Grand Central cluster) Location: Eloy, AZ Client/EPC: AES Products/Services: Trimark SCADA Systems Integration…

Learn More

Townsite Solar

Jun 26, 2023

Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…

Learn More
Four Hydroelectric Power Generation Resources

Four Hydroelectric Power Generation Resources

Jan 11, 2019

Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today