Trimark’s Expert Voices
Dec 12, 2023
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS
Location: Taos, NM
Client/EPC: Torch Clean Energy
Trimark delivered Vantage™ SCADA controls for the Taos Mesa Energy Facility in New Mexico. It is the first PV+BESS resource control solution to fully comply with the Modular Energy System Architecture Distributed Energy Resource (MESA-DER) open standard. The “hybrid” site controller manages a 15 MWac solar photovoltaic (PV) array along with a 12 MWac / 24 MWh (2 hour) Tesla battery system.
Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…
Trimark will exhibit at the Cleanpower Conference and Exhibition, May 7-9, 2024 in the Minneapolis Convention Center. You can find…
Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…
Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…
Project Type: Automated Metering Infrastructure (AMI) Location: VA, MD, PA, NJ, CT and ME Client: Subcontractor to Weston; Client: Naval…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today