Edwards Sanborn

SBES

Project Type: 810MW AC Hybrid Site (Solar + BESS) comprised of seven separate resouces
Location: Mojave, CA
Client/EPC: Terra-Gen

Trimark delivered and commissioned plant controls for all resources in Edwards-Sanborn Phase 1A – the world’s largest capacity solar-plus-storage project. The seven resources included in the Mojave-based Phase 1A have a nameplate capacity of 810 MW (LGIA limit of 634 MW).

Each resource is managed by Trimark’s intelligent power plant controller (PPC), a utility-scale SCADA system designed to optimize the profitability of photovoltaic (PV) and battery energy storage system (BESS) resources that participate in California’s open energy markets.

To maximize output and support stable power at the point of deliver, each resource’s PPC considers the losses introduced by any of the five hybrid (PV+BESS) and/or two BESS resources. Trimark’s Dynamic Loss Compensator (DLC) calculates energy losses for each resource and applies the value as a control point to the affiliated PPC. Each PPC then adjusts generation, charge and discharge decisions in real time to ensure that its resource delivers the maximum power allowed by the LGIA or the ISO’s target value.

Trimark News

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Built Right in the USA

Jan 21, 2025

Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More
Gaskell

Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS

Apr 18, 2022

Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Cement City

Cement City

Jun 26, 2023

Project Type: 22 MW PV Location: Cement City, MI Client/EPC: AES Products/Services: Trimark SCADA, Trimark Historian, Revenue Meter, MET Stations,…

Learn More
TOC

Clearway Energy Multi-Site Maintenance Service Agreements

Jan 29, 2020

Project Type: PV generating facilities and wind generating facilities – 21 sites Location: CA; one site in AZ Client/EPC: NRG…

Learn More

Lancaster Area Battery (LAB)

Jun 26, 2023

Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…

Learn More

Angel Fire Solar Energy Center

Jun 26, 2023

Project Type: 15 MW PV/25 MWh BESS Location: Angel Fire, NM Client/EPC: Torch Clean Energy Products/Services: Trimark SCADA including Vantage,…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today