Lancaster Area Battery (LAB)

Project Type: 127 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES

Products/Services: MPPC Modifications, Vantage User interface Configuration and Hosting, NERC – CIP, Integration of BESS Controls with MPPC and CAISO ADS, and Networking.

Trimark worked with AES on the Lancaster Area Battery (LAB) BESS Project, rated at 127 MW AC, to help AES reach their primary project goal of making the solar energy generated in this project a dispatchable renewable energy resource, and adding additional clean energy available to its end user customers into their Renewable portfolio. With the utilization of Trimark’s services, such as MPPC Modifications, Vantage Configuration and Hosting, NERC – CIP, Integration of BESS Controls

Trimark News

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More
RIG-Blog-Thumbnail

CAISO to Discontinue TLS 1.0/1.1 Support for RIGs

Apr 13, 2021

To our valued clients, You may have recently seen the following email from CAISO: You are receiving this notice as…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

25-Years of Innovative Solutions for Electric Power Infrastructure

Mar 28, 2025

Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark On-Premise Controller Meets NERC-CIP Requirements

Aug 01, 2022

Trimark’s System Supports Centralized Control and Cyber Security Best Practices Trimark Associates, Inc., the industry leader in intelligent renewable energy…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Four Hydroelectric Power Generation Resources

Four Hydroelectric Power Generation Resources

Jan 11, 2019

Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…

Learn More
sPower Solar Portfolio

AES Solar Portfolio

Jan 04, 2019

Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…

Learn More
Alta Wind 4, 5, 8, and 9

Alta Wind 4, 5, 8, and 9

Jan 06, 2019

> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…

Learn More
Midway II

Midway II

Dec 03, 2018

Project Type: PV rated at 30 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!