Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS
Apr 18, 2022
Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…
Project Type: 127 MW AC coupled BESS
Location: Lancaster, CA
Client/EPC: AES
Products/Services: MPPC Modifications, Vantage User interface Configuration and Hosting, NERC – CIP, Integration of BESS Controls with MPPC and CAISO ADS, and Networking.
Trimark worked with AES on the Lancaster Area Battery (LAB) BESS Project, rated at 127 MW AC, to help AES reach their primary project goal of making the solar energy generated in this project a dispatchable renewable energy resource, and adding additional clean energy available to its end user customers into their Renewable portfolio. With the utilization of Trimark’s services, such as MPPC Modifications, Vantage Configuration and Hosting, NERC – CIP, Integration of BESS Controls
First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…
Project Type: PV generating facility rated at 100 MW Location: Los Angeles County, CA Client/EPC: Cupertino Electric Owner: sPower Products/Services:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today