Chevron 2 and 8.5

Chevron

Project Type: PV rated at 10.5 MW (Aggregated)

Location: Richmond, CA

EPC: Cenergy Power

Products/Services: SCADA, revenue meters, MET stations, CAISO NRI

Developed by Sustainable Power Group (sPower), the site included Solectria inverters, an ATI DuraTrack solar tracking system, and CAISO MET stations consisting of Hukselflux Pyranometers, a Lufft all-in-one weather station, back-of-module temperature sensors, and a rain gauge. Trimark integrated these devices into the Trimark Data Gateway to provide a delivery pathway of these telemetry points to the CAISO EMS division. These data sensors were assimilated into Trimark’s Vantage HMI, making these points available through real-time and historic trending and accessible through the solar performance analysis platform.

Trimark News

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More
Gaskell

Trimark Contracted for SCADA and NRI Services for Gaskell 2-5 PV+BESS

Apr 18, 2022

Trimark Associates, Inc., the industry leader in intelligent energy management, has been awarded a contract to provide integrated SCADA, complex…

Learn More

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More
Trimark Finalizes Controls for Phase 1A of World’s Largest PV+BESS Project

Trimark Awarded SCADA for World’s Largest PV+BESS Project

Feb 17, 2021

The Edwards & Sanborn project redefines the utility-scale PV+Storage landscape. Folsom, CA, February 17, 2021 – Trimark Associates, Inc. is…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Alta Wind 4, 5, 8, and 9

Alta Wind 4, 5, 8, and 9

Jan 06, 2019

> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…

Learn More

Townsite Solar

Jun 26, 2023

Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…

Learn More

Townsite Solar

Jun 26, 2023

Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…

Learn More

Lancaster Area Battery (LAB)

Jun 26, 2023

Project Type: 127 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Products/Services: MPPC Modifications, Vantage User interface Configuration and…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today