Project Type: PV rated at 200 MW
Location: Kern County, California
Client: Signal Energy Constructors
Products and Services: SCADA, RIG, revenue meters, MET stations, CAISO NRI
The Garland Solar project is owned by Southern Power and Recurrent Energy. Trimark provided an integrated solution for PV control, compliance, and accurate settlements.
Trimark is proud to design and manufacture mission-critical systems used to operate electric power generation resources. “Our systems are built…
Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…
Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…
Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…
Project Type: Wind sites – over 21 sites Location: CA Client/EPC: N/A Products/Services: Multi-site service agreement with Trimark Operations Center…