AES Solar Portfolio

sPower Solar Portfolio

Location: 28 Projects throughout the United States

EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric, Blattner Energy, Mortenson Construction

Products/Services: Trimark SCADA including Vantage, CAISO compliance, metering, network drops

AES operates a fleet of Solar Power Production facilities that generate over 1 GW of renewable power. This fleet is managed and operated at their Operations Center. The sites and all of the Operations Center systems are based on Trimark’s SCADA and Vantage platforms.

Trimark News

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More
IMG_3829

Happy National Math Day (and Pi Day Too)

Mar 11, 2022

Ask any electrical engineer for their favorite mathematical formula and you’re likely to hear all about Ohm’s law. It’s an…

Learn More

25-Years of Innovative Solutions for Electric Power Infrastructure

Mar 28, 2025

Trimark Associates, Inc. is celebrating 25 years of success in delivering solutions that utility-scale electric power resources require to control…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Big Sky North Substation

Big Sky North Substation

Jan 10, 2019

Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….

Learn More
Bayshore A, B, and C

Bayshore A, B, and C

Dec 30, 2018

Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…

Learn More
Midway II

Midway II

Dec 03, 2018

Project Type: PV rated at 30 MW Location: Near Calipatria, CA in the Imperial Valley EPC: Blattner Energy Products/Services: SCADA,…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today