Bayshore A, B, and C

Bayshore A, B, and C

Bayshore A, B, and C Projects

Project Type: PV rated at 20 MW each

Location: Lancaster, CA in LA County

EPC: Signal Energy

Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.

Trimark News

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More
Trimark Commissions Controls for Luna BESS

Trimark Commissions Controls for Luna BESS

Aug 04, 2022

Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…

Learn More

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Olsen Hydroelectric

Olsen Hydroelectric

Jan 10, 2020

Project Type: Hydro generating facility rated at 5 MW Location: Whitmore, CA Client/EPC: Olsen Power Partners Products/Services: Revenue meters, CAISO…

Learn More
Nicolis and Tropico

Nicolis and Tropico

Dec 05, 2018

Project Type: PV rated at 20 MW and 14 MW Location: Tulare County, California Client: Blue Oak Energy Products/Services: SCADA…

Learn More
Olsen Hydroelectric

Olsen Hydroelectric

Jan 10, 2020

Project Type: Hydro generating facility rated at 5 MW Location: Whitmore, CA Client/EPC: Olsen Power Partners Products/Services: Revenue meters, CAISO…

Learn More
Hawaii Advanced Metering Infrastructure

Hawaii Advanced Metering Infrastructure (AMI)

Jan 08, 2019

Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today