Bayshore A, B, and C

Bayshore A, B, and C

Bayshore A, B, and C Projects

Project Type: PV rated at 20 MW each

Location: Lancaster, CA in LA County

EPC: Signal Energy

Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.

Trimark News

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

ALERT — SQMD Plan Affirmations Due to CAISO October 31

Aug 29, 2023

Experts say, “Don’t wait to ask for help” Folsom, CA, August 29, 2023 – If your resource participated in the…

Learn More

Trimark Names John Renfroe as Vice President of Software Engineering

Mar 20, 2023

New VP to Lead Strategic Direction for Software and Technology Folsom, CA, March 21, 2023 – Trimark Associates, Inc., the…

Learn More

Trimark Headed to RE+ 2024

Aug 01, 2024

Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Bayshore A, B, and C

Bayshore A, B, and C

Dec 30, 2018

Bayshore A, B, and C Projects Project Type: PV rated at 20 MW each Location: Lancaster, CA in LA County…

Learn More
Luna-BESS-from-Above

Luna BESS

Jun 26, 2023

Project Type: 100 MW AC coupled BESS Location: Lancaster, CA Client/EPC: AES Luna BESS supports power stability by addressing the…

Learn More
La Brisa Wind Farm

La Brisa Wind Farm

Jan 10, 2020

Project Type: Wind generating facility rated at 9 MW Location: Birds Landing Switching Station, Solano County, CA Client/EPC: EDF Renewable…

Learn More
Hope Mills

Hope Mills

Jan 05, 2019

Project Type: PV rated at 80 MW Location: Hope Mills, North Carolina Client: Entropy Solar Integrators, Affinity Automation, LLC, and…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today