Bayshore A, B, and C

Bayshore A, B, and C

Bayshore A, B, and C Projects

Project Type: PV rated at 20 MW each

Location: Lancaster, CA in LA County

EPC: Signal Energy

Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.

Trimark News

Trimark Promotes Tom Short to Vice President of Consulting and Client Relations

Apr 04, 2023

Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…

Learn More

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Announces Promotions to Enhance Client Service

Feb 01, 2024

Trimark has announced organizational changes and promotions to bolster the company’s commitment to service excellence. “Rapid market growth in the…

Learn More

Trimark Validates and Submits Data Required for First “Large Facility” WREGIS Thermal Renewable Energy Credit

May 05, 2022

First “Large Facility” WREGIS Thermal Renewable Energy Credit In May 2022, Trimark Associates, Inc. became the first Qualified Reporting Entity…

Learn More

Trimark to Exhibit at Cleanpower 2024 in Minneapolis

Feb 22, 2024

Trimark will exhibit at the Cleanpower Conference and Exhibition, May 7-9, 2024 in the Minneapolis Convention Center. You can find…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Cement City

Cement City

Jun 26, 2023

Project Type: 22 MW PV Location: Cement City, MI Client/EPC: AES Products/Services: Trimark SCADA, Trimark Historian, Revenue Meter, MET Stations,…

Learn More
U.S. Navy – Naval District Washington Energy Management

U.S. Navy – Naval District Washington Energy Management

Jan 01, 2019

Installed 1,043 advanced energy meters to track energy usage throughout Northern Virginia, Washington D.C., and Maryland. Work involved 14 separate…

Learn More
Beacon Solar

Beacon Solar

Jan 05, 2019

Project Type: PV rated at 152 MW combined Location: California City, California Client: Rosendin Electric Products and Services: SCADA, meter,…

Learn More
Carlsbad Energy Center

Carlsbad Energy Center

Jan 10, 2020

Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today