Bayshore A, B, and C

Bayshore A, B, and C

Bayshore A, B, and C Projects

Project Type: PV rated at 20 MW each

Location: Lancaster, CA in LA County

EPC: Signal Energy

Products/Services: SCADA, revenue meters, Master Plant Controller (MPC)

Developed, owned, and operated by Sustainable Power Group (sPower), these sites included at total of 21 Power Electronic 2330kW inverters and an ATI V3.0 tracking system. As part of the Big Sky Substation to aggregation of renewable resources, these sites were included into the Master Plant Controller to provide a central source of voltage and VAR regulation to support greater grid stability. The Bayshore sites became the 6th, 7th, and 8th additions to the Big Sky Substation. Signal Energy was the EPC responsible for managing construction. Trimark was given the responsibility to establish power regulation through its SCADA platform and integrate it with the Big Sky Substation Master Plant Controller for further grid stability support.

Trimark News

Trimark’s Expert Voices

Dec 12, 2023

Vince Brashear, P.E., Director of Design and Engineering “The systems we design are a small, but critical, part of power…

Learn More

Cloud-Based ADS Supports Participation in Ancillary Services Market

Oct 06, 2023

Folsom, CA, October 6, 2023 – Trimark has introduced cloud-based, Automatic Dispatch System (ADS) services to help small BESS and…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Meeting CAISO Rules for BESS Metering

Feb 26, 2024

Trimark’s Experts Weigh in on Separating Retail and Wholesale Meter Data for Battery Energy Storage Systems (BESS) The rapid increase…

Learn More

Energix Renewables Partners with Trimark to Deliver Portfolio-Wide Ignition SCADA on RTAC

Dec 16, 2022

Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, has entered a technology partnership with Energix Renewables to…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Alta Wind 4, 5, 8, and 9

Alta Wind 4, 5, 8, and 9

Jan 06, 2019

> Project Type: CAISO meter replacements Alta Wind 4 & 5 – Owned by Clearway Energy Alta Wind 8 –…

Learn More
Carlsbad Energy Center

Carlsbad Energy Center

Jan 10, 2020

Project Type: 527 MW natural gas-fueled electricity generating plant Location: Carlsbad, CA Client/EPC: NRG Energy Products/Services: Trimark integrated ADS into…

Learn More
Chevron

Chevron 2 and 8.5

Jan 22, 2019

Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…

Learn More
Big Sky North Substation

Big Sky North Substation

Jan 10, 2019

Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today