Project Type: PV generating facility rated at 100 MW
Location: Los Angeles County, CA
Client/EPC: Cupertino Electric
Owner: sPower
Products/Services: Trimark provided an end-to-end solution for two solar arrays including a virtual server which runs the Trimark SCADA System with Historian, 9 revenue meters with integration into a Trimark loss compensation system, and 21 network drops. Trimark additionally integrated this resource into an existing CAISO RIG, provided CAISO New Resource Implementation (NRI) services, met NERC/CIP Network Compliance, and coordinated with a third party vendor to integrate MET Stations and sensors into Trimark’s SCADA. To meet CAISO Market and SCE Transmission requirements, controls at the POI were done by integrating into the Trimark Master Plant Controller (MPC) at the sPower Big Sky Substation.
Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…
Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….
Trimark has announced organizational changes and promotions to bolster the company’s commitment to service excellence. “Rapid market growth in the…
Project Type: 15 MW PV/25 MWh BESS Location: Angel Fire, NM Client/EPC: Torch Clean Energy Products/Services: Trimark SCADA including Vantage,…
Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today