San Pablo Raceway A and B

San Pablo Raceway A and B

Project Type: PV generating facility rated at 100 MW

Location: Los Angeles County, CA

Client/EPC: Cupertino Electric

Owner: sPower

Products/Services: Trimark provided an end-to-end solution for two solar arrays including a virtual server which runs the Trimark SCADA System with Historian, 9 revenue meters with integration into a Trimark loss compensation system, and 21 network drops. Trimark additionally integrated this resource into an existing CAISO RIG, provided CAISO New Resource Implementation (NRI) services, met NERC/CIP Network Compliance, and coordinated with a third party vendor to integrate MET Stations and sensors into Trimark’s SCADA. To meet CAISO Market and SCE Transmission requirements, controls at the POI were done by integrating into the Trimark Master Plant Controller (MPC) at the sPower Big Sky Substation.

Trimark News

Trimark Adds Texas Office to Serve Growing, Green-Energy Market

Aug 09, 2022

Solar Power Generation is Booming in Texas. Trimark is Committed to Help. Folsom, CA, August 8, 2022 – Trimark Associates,…

Learn More
Names Rajinita Haumschilt

Trimark Names Rajinita Haumschilt as Financial Controller

Apr 28, 2023

Controller to Lead Trimark Accounting Team and Processes Folsom, CA, April 28, 2023 – Trimark Associates, Inc. (Trimark), the industry…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Trimark’s Domestic Content Documentation Supports IRA Tax Bonus Claims

Jan 02, 2024

Trimark has a long history of buying devices that are manufactured in the U.S. So when the Inflation Reduction Act…

Learn More

Trimark Now Supports SEL RTAC and NovaTech Orion RIGs in CAISO Market

Feb 01, 2024

Trimark now supports third-party Remote Intelligent Gateways (RIGs) including the SEL RTAC and NovaTech Orion through the Trimark Operations Center….

Learn More

Trimark Announces Promotions to Enhance Client Service

Feb 01, 2024

Trimark has announced organizational changes and promotions to bolster the company’s commitment to service excellence. “Rapid market growth in the…

Learn More

Projects

Example Projects

Take a minute to see how Trimark has helped resource owners, EPCs, and ISOs change the electric grid.
View All Projects
Midlant Advanced Metering Infrastructure

Midlant Advanced Metering Infrastructure (AMI)

Jan 09, 2019

Project Type: Automated Metering Infrastructure (AMI) Location: VA, MD, PA, NJ, CT and ME Client: Subcontractor to Weston; Client: Naval…

Learn More
DCIM

Taos Mesa Energy Center

Jun 26, 2023

Project Type: 15MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 15MW PV, 7MW/14MWh BESS Location: Taos, NM Client/EPC: Torch Clean…

Learn More

Angel Fire Solar Energy Center

Jun 26, 2023

Project Type: 15 MW PV/25 MWh BESS Location: Angel Fire, NM Client/EPC: Torch Clean Energy Products/Services: Trimark SCADA including Vantage,…

Learn More

Townsite Solar

Jun 26, 2023

Project Type: 180 MW Point-of-Delivery (POD) PV/BESS Hybrid Resource composed of 230MW PV, 90MW/360MWh BESS Location: Boulder City, NV Client/EPC:…

Learn More

Ready. Set.

Letʼs go!

Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?

Weʼve got you!

Get Started Today