Project Type: 100 MW PV (Part of Grand Central cluster)
Location: Eloy, AZ
Client/EPC: AES
Products/Services: Trimark SCADA Systems Integration and Network Drops.
The West Line project consisted of a 100 MW AC solar project located on private lands in City of Coolidge and Pinal County, Arizona. This Project interconnected to Pinal West 230kV substation via approximately 1.2 miles of underground 230kV running north/south between the eastern edge of county pavement and west of the ED2 MV distribution overhead lines. Trimark assisted AES in this project by providing Trimark SCADA Systems Integration along with 30 Network Drops included with patch panels.
Trimark will exhibit at the RE+ conference, September 10-12, 2024 in the Anaheim Convention Center. Trimark’s will be at booth…
Trimark Associates, Inc. (Trimark) successfully completed pilot testing for the first resources to pass Southern California Edison’s (SCE) strict, new,…
Trimark Associates, Inc. (Trimark), the industry leader in advanced energy control, complex revenue metering, and regulatory compliance, has promoted five…
Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…
Provided, installed and configured 477 advanced energy meters at Pearl Harbor, Island, Smith and Hickam AFBs. Project included configuration, testing,…