Project Type: 100 MW PV (Part of Grand Central cluster)
Location: Eloy, AZ
Client/EPC: AES
Products/Services: Trimark SCADA Systems Integration and Network Drops.
The West Line project consisted of a 100 MW AC solar project located on private lands in City of Coolidge and Pinal County, Arizona. This Project interconnected to Pinal West 230kV substation via approximately 1.2 miles of underground 230kV running north/south between the eastern edge of county pavement and west of the ED2 MV distribution overhead lines. Trimark assisted AES in this project by providing Trimark SCADA Systems Integration along with 30 Network Drops included with patch panels.
Trimark Associates, Inc. (Trimark), the industry leader in intelligent energy control, advanced metering, and regulatory compliance, has announced that Rajinita…
Folsom, CA, March 30, 2023 – Trimark Associates, Inc., the industry leader in intelligent energy control, advanced metering, and regulatory…
Intelligent Battery Control Supports Grid Stability Folsom, CA, August 4, 2022 – Trimark Associates, Inc., the industry leader in intelligent…
Project Type: Hydroelectric with 10.6 MW combined Location: Shasta County, California Client: Stoel Rives, LLP for PG&E Products and Services:…
Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…
Need a SCADA system that optimizes revenue?
Need help meeting interconnection requirements?
Want to stay in the market and avoid fines?
Weʼve got you!
Get Started Today